APLIKASI METODE CRASH PROGRAM DAN METODE FAST TRACK PADA PENENTUAN WAKTU DAN BIAYA OPTIMAL PROYEK PERUMAHAN GRANOLA HOUSING PT. FORKONT SATRIA NUSANTARA, PALEMBANG

BENO, OKTA and Puspita, Fitri Maya and Indrawati, Indrawati (2023) APLIKASI METODE CRASH PROGRAM DAN METODE FAST TRACK PADA PENENTUAN WAKTU DAN BIAYA OPTIMAL PROYEK PERUMAHAN GRANOLA HOUSING PT. FORKONT SATRIA NUSANTARA, PALEMBANG. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_44201_08011181924013.pdf] Text
RAMA_44201_08011181924013.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_44201_08011181924013_TURNITIN.pdf] Text
RAMA_44201_08011181924013_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_44201_08011181924013_0006107501_00100667102_01_front_ref.pdf] Text
RAMA_44201_08011181924013_0006107501_00100667102_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (715kB)
[thumbnail of RAMA_44201_08011181924013_0006107501_00100667102_02.pdf] Text
RAMA_44201_08011181924013_0006107501_00100667102_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (268kB) | Request a copy
[thumbnail of RAMA_44201_08011181924013_0006107501_00100667102_03.pdf] Text
RAMA_44201_08011181924013_0006107501_00100667102_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (45kB) | Request a copy
[thumbnail of RAMA_44201_08011181924013_0006107501_00100667102_04.pdf] Text
RAMA_44201_08011181924013_0006107501_00100667102_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (489kB) | Request a copy
[thumbnail of RAMA_44201_08011181924013_0006107501_00100667102_05.pdf] Text
RAMA_44201_08011181924013_0006107501_00100667102_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (45kB) | Request a copy
[thumbnail of RAMA_44201_08011181924013_0006107501_00100667102_06_ref.pdf] Text
RAMA_44201_08011181924013_0006107501_00100667102_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (173kB) | Request a copy
[thumbnail of RAMA_44201_08011181924013_0006107501_00100667102_07_lamp.pdf] Text
RAMA_44201_08011181924013_0006107501_00100667102_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (878kB) | Request a copy

Abstract

This study aim analyzes the accelerated completion duration of the Granola Housing of PT. Forkont Satria Nusantara, Palembang with crash program and fast track methods on the critical path that is sought using Critical Path Method (CPM), is then formulated in the linear program. where on crash program method using the alternative of adding four hours of work hours and implementing the system shift work. The results are known to the total cost of the project using the crash program method with the alternative of adding four hours of work which is IDR519,255,022 with accelerated duration of 35 days or more expensive 5.72% of the project cost in normal conditions.Whereas the total cost in alternative system implementation shift work using the crash program method namely IDR533,556,616 with an accelerated duration of 63 days or 8.64% more expensive than the project cost under normal conditions. Total cost using the fast track method has increase in indirect costs of IDR511,472,470 with accelerated duration of 63 daysor 4.15% more expensive than the project cost under normal conditions. Fast track method more effective and economical. Keywords: Crash Program, Fast Track, Program Linear.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Crash Program, Fast Track, Program Linear.
Subjects: Q Science > QA Mathematics > QA801-939 Analytic mechanics > QA911.Z54 Fluid dynamics--Mathematical models. Multiphase flow--Mathematical models. Turbulence--Mathematical models. Combustion--Mathematical models. Combustion--Mathematical models. Fluid dynamics--Mathematical models. Multiphase flow
Divisions: 08-Faculty of Mathematics and Natural Science > 44201-Mathematics (S1)
Depositing User: Okta Beno
Date Deposited: 09 May 2023 07:34
Last Modified: 09 May 2023 07:34
URI: http://repository.unsri.ac.id/id/eprint/101120

Actions (login required)

View Item View Item