PERBANDINGAN DURASI DAN BIAYA PROYEK PELEBARAN JALAN MENGGUNAKAN METODE PENJADWALAN KURVA-S DAN LINE OF BALANCE (STUDI KASUS : PROYEK PELEBARAN JALAN NASIONAL KOTA MARTAPURA KABUPATEN OGAN KOMERING ULU TIMUR)

APRILLIA, NURMALITA and Susanti, Betty and Toyfur, Mona Foralisa (2019) PERBANDINGAN DURASI DAN BIAYA PROYEK PELEBARAN JALAN MENGGUNAKAN METODE PENJADWALAN KURVA-S DAN LINE OF BALANCE (STUDI KASUS : PROYEK PELEBARAN JALAN NASIONAL KOTA MARTAPURA KABUPATEN OGAN KOMERING ULU TIMUR). Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011381720006.pdf] Text
RAMA_22201_03011381720006.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_22201_03011381720006_TURNITIN.pdf] Text
RAMA_22201_03011381720006_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy
[thumbnail of RAMA_22201_03011381720006_0004018001_0007047401_01_front_ref.pdf]
Preview
Text
RAMA_22201_03011381720006_0004018001_0007047401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Preview
[thumbnail of RAMA_22201_03011381720006_0004018001_0007047401_02.pdf] Text
RAMA_22201_03011381720006_0004018001_0007047401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (473kB) | Request a copy
[thumbnail of RAMA_22201_03011381720006_0004018001_0007047401_03.pdf] Text
RAMA_22201_03011381720006_0004018001_0007047401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (118kB) | Request a copy
[thumbnail of RAMA_22201_03011381720006_0004018001_0007047401_04.pdf] Text
RAMA_22201_03011381720006_0004018001_0007047401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_22201_03011381720006_0004018001_0007047401_05.pdf] Text
RAMA_22201_03011381720006_0004018001_0007047401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (147kB) | Request a copy
[thumbnail of RAMA_22201_03011381720006_0004018001_0007047401_06_ref.pdf] Text
RAMA_22201_03011381720006_0004018001_0007047401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (125kB) | Request a copy
[thumbnail of RAMA_22201_03011381720006_0004018001_0007047401_07_lamp.pdf] Text
RAMA_22201_03011381720006_0004018001_0007047401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

Bar-Chart and S-Curve are the scheduling methods generally used by construction projects in Indonesia, use for typical construction, but it’s not being able to facilitate uninterrupted resources (labor) from one unit to the next and disruption what happens difficult to correct. Line of Balance is a scheduling method used for typical construction because it’s able to facilitate uninterrupted resources (labor) from one unit to the next, disturbances that occur easily corrected, and pauses in duration during the labor can be used to do work. This study aims to calculate the duration and cost using the Line of Balance scheduling method then compare with duration and cost of the S-Curve scheduling method. The National Road Widening Project in Martapura City, East Ogan Komering Ulu Regency is able to apply the Line of Balance scheduling method because it’s a typical construction project. Secondary data used for research in the form of S-Curve plan, duration of work, labors, hours worked, work days, time buffer project, and project RAB. Calculation of duration using Microsoft Excel 2016 software and drawing a line diagram using AutoCAD 2014 software. The duration after using the Line of Balance scheduling method is 180 days. This duration is same as the plan duration of the S-Curve scheduling method. This’s because there are limitations in this study, namely the amount of labor used is equal to the labors planning the S-Curve scheduling method. Because the duration and labors are the same as the S-Curve scheduling method, the fixed cost is Rp9,784,900,000.00.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Kurva-S, Line of Balance, tenaga kerja, durasi, biaya
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Users 2191 not found.
Date Deposited: 04 Oct 2019 06:53
Last Modified: 04 Oct 2019 06:53
URI: http://repository.unsri.ac.id/id/eprint/10229

Actions (login required)

View Item View Item