KAJIAN TEKNIS PRODUKTIVITAS ALAT GALI MUAT DAN ALAT ANGKUT PADA KEGIATAN PENAMBANGAN BATUBARA DI PIT ELANG PT. ULIMA NITRA, TBK JOBSITE MME DARMO, MUARA ENIM, SUMATERA SELATAN

PRATAMA, M. ADITYA and Toha, M. Taufik and Mukiat, Mukiat (2023) KAJIAN TEKNIS PRODUKTIVITAS ALAT GALI MUAT DAN ALAT ANGKUT PADA KEGIATAN PENAMBANGAN BATUBARA DI PIT ELANG PT. ULIMA NITRA, TBK JOBSITE MME DARMO, MUARA ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381621068.pdf] Text
RAMA_31201_03021381621068.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021381621068_TURNITIN.pdf] Text
RAMA_31201_03021381621068_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021381621068_8864000016_0022115801_01_front_ref.pdf] Text
RAMA_31201_03021381621068_8864000016_0022115801_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021381621068_8864000016_0022115801_02.pdf] Text
RAMA_31201_03021381621068_8864000016_0022115801_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (469kB) | Request a copy
[thumbnail of RAMA_31201_03021381621068_8864000016_0022115801_03.pdf] Text
RAMA_31201_03021381621068_8864000016_0022115801_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (420kB) | Request a copy
[thumbnail of RAMA_31201_03021381621068_8864000016_0022115801_04.pdf] Text
RAMA_31201_03021381621068_8864000016_0022115801_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (639kB) | Request a copy
[thumbnail of RAMA_31201_03021381621068_8864000016_0022115801_05.pdf] Text
RAMA_31201_03021381621068_8864000016_0022115801_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (176kB) | Request a copy
[thumbnail of RAMA_31201_03021381621068_8864000016_0022115801_06_ref.pdf] Text
RAMA_31201_03021381621068_8864000016_0022115801_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (254kB) | Request a copy
[thumbnail of RAMA_31201_03021381621068_8864000016_0022115801_07_lamp.pdf] Text
RAMA_31201_03021381621068_8864000016_0022115801_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT. Ulima Nitra, Tbk is a coal mining company located in Muara Enim, South Sumatra. Coal mining activities are carried out using digging and loading equipment in the form of 1 unit of Volvo EC480DL excavator and 1 unit of Komatsu PC850 excavator. And hauling equipment in the form of UD Quester CWE280 dump trucks as many as 13 units. The coal production target in 2021 is 1.553.000 tons/year, but in reality the production target cannot be achieved in February and March. The purpose of this study was to obtain the productivity of excavating and hauling equipment,match factor value, the factors that cause unreachable coal production and evaluation of efforts to increase the productivity of transport equipment to achieve production targets every month and match factor value after repair. The data taken in the field consists of the cycle time of the excavating and hauling equipment, the amount of coal filling in the conveyance and supporting data of the company. In this study, the analysis and calculation productivity of excavating and hauling equipments is carried out to further evaluate and repair efforts. The results of the evaluation of the productivity of excavating and hauling equipment showed that the productivity of the excavator did not experience problems, but the productivity of the hauling equipment did not reach the company's target plan, this was due to the low job efficiency and loading of coal in the dump truck CWE Quester280 with match factor <1. As for the efforts made to increase the productivity of hauling equipment by increasing effective work time by improving obstacles that can be avoided such as minimizing stopping work before rest, working late after rest and stopping work before working hours are finished so job efficiency increases from 59 % to 64 %. So the productivity of hauling equipment is increased from 1.283.066,87 tons to 1.643.065,75 tons. Keywords: Coal, Production, Factors Affecting Production, Productivity of excavating and hauling equipment. Literature : 10 (1992-2016)

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Batubara, Produksi, Faktor-Faktor yang Mempengaruhi Produksi, Produktivitas alat gali muat dan angkut.
Subjects: T Technology > T Technology (General) > T58.7-58.8 Production capacity. Manufacturing capacity > T58.8 Productivity. Efficiency Standardization Cf. TA368 Standards (Collections, indexes, etc.)
T Technology > TA Engineering (General). Civil engineering (General) > TA1001-1280 Transportation engineering
T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: M. Aditya Pratama
Date Deposited: 15 May 2023 08:45
Last Modified: 15 May 2023 08:45
URI: http://repository.unsri.ac.id/id/eprint/103201

Actions (login required)

View Item View Item