PUTRA, ANTOMI NIKARDO and Yusuf, Maulana and Syafaruddin, Syafaruddin (2019) OPTIMASI RENCANA PRODUKSI PENGUPASAN OVERBURDEN MARET 2019 - DESEMBER 2019 BERDASARKAN KETERSEDIAAN PERALATAN DI TAMBANG BANKO BARAT PIT 2 PT. BUKIT ASAM, TBK. Undergraduate thesis, Sriwijaya University.
Preview |
Text
RAMA_31201_03021181520132_00250959003_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) | Preview |
Text
RAMA_31201_03021181520132_00250959003_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (333kB) | Request a copy |
|
Text
RAMA_31201_03021181520132_00250959003_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (579kB) | Request a copy |
|
Text
RAMA_31201_03021181520132_00250959003_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (666kB) | Request a copy |
|
Text
RAMA_31201_03021181520132_00250959003_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (211kB) | Request a copy |
|
Text
RAMA_31201_03021181520132_00250959003_06_ref.pdf - Bibliography Restricted to Repository staff only Download (330kB) | Request a copy |
|
Text
RAMA_31201_03021181520132_00250959003_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
|
Text
RAMA_31201_03021181520132.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_31201_03021181520132_TURNITIN.pdf - Updated Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (23MB) | Request a copy |
Abstract
Coal mining activities at PT Bukit Asam Tbk are designed according to the mining plan which starts from a five-year plan by the Long Term Work Plan Unit (PJP), then detailed into the coal mining plan by the Operational Planning Work Unit (Renop) and will be detailed again into Daily Coal Mining Plan by the Daily Planning Work Unit (Renhar). The transfer of overburden in the initial 2 months (January and February) in 2019 has not yet reached optimal production, each of which reached 496,310 BCM in January and 352,920 BCM in February respectively, while the target of each month is to be visited. 705,000 BCM. Based on the production target for overburden removal from March 2019 to December 2019, it will amount to 9,090,000 BCM. Transfer of overburden in January and February is not according to plan so plan optimization is needed in the following months (March to December). After optimizing the production plan by increasing effective road hours and work efficiency 3 %, production targets from March to December can reach 804,000 BCM in March, 796,000 BCM in April, 949,000 BCM in May, 1,023,000 in June, 1,023,000 in June, 1,155. 000 July BCM, 1,140,000 BCM in August, 898,000 BCM in September, 895,000 BCM in October, 782,000 BCM in November, 92,000 BCM in December, so the total overburden transfer in March 2019 - December 2019 was 9,361,000 BCM. Keywords: overburden removal, effective road hours, work efficiency.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Optimasi Rencana Produksi, Pengupasan Overburden |
Subjects: | T Technology > TK Electrical engineering. Electronics Nuclear engineering > TK1001-1841 Production of electric energy or power. Powerplants. Central stations > TK1051.B37 Coal-fired power plants. Electric power production T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Users 2253 not found. |
Date Deposited: | 07 Oct 2019 01:44 |
Last Modified: | 07 Oct 2019 03:40 |
URI: | http://repository.unsri.ac.id/id/eprint/10687 |
Actions (login required)
View Item |