ANALISIS KELAYAKAN INVESTASI RENCANA PEMBUKAAN TAMBANG NIKEL DI PT TONIA MITRA SEJAHTERA, KABUPATEN BOMBANA, SULAWESI TENGGARA

SINAGA, ANDREAS SAUT TUA and Amin, Muhammad and Komar, Syamsul (2023) ANALISIS KELAYAKAN INVESTASI RENCANA PEMBUKAAN TAMBANG NIKEL DI PT TONIA MITRA SEJAHTERA, KABUPATEN BOMBANA, SULAWESI TENGGARA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281823070.pdf] Text
RAMA_31201_03021281823070.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021281823070_TURNITIN.pdf] Text
RAMA_31201_03021281823070_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021281823070_0018085815_0010125201_01_front_ref.pdf] Text
RAMA_31201_03021281823070_0018085815_0010125201_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (481kB)
[thumbnail of RAMA_31201_03021281823070_0018085815_0010125201_02.pdf] Text
RAMA_31201_03021281823070_0018085815_0010125201_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (573kB) | Request a copy
[thumbnail of RAMA_31201_03021281823070_0018085815_0010125201_03.pdf] Text
RAMA_31201_03021281823070_0018085815_0010125201_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (263kB) | Request a copy
[thumbnail of RAMA_31201_03021281823070_0018085815_0010125201_05.pdf] Text
RAMA_31201_03021281823070_0018085815_0010125201_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (48kB) | Request a copy
[thumbnail of RAMA_31201_03021281823070_0018085815_0010125201_04.pdf] Text
RAMA_31201_03021281823070_0018085815_0010125201_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (543kB) | Request a copy
[thumbnail of RAMA_31201_03021281823070_0018085815_0010125201_06_ref.pdf] Text
RAMA_31201_03021281823070_0018085815_0010125201_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (35kB) | Request a copy
[thumbnail of RAMA_31201_03021281823070_0018085815_0010125201_07_lamp.pdf] Text
RAMA_31201_03021281823070_0018085815_0010125201_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (765kB) | Request a copy

Abstract

Indonesia is a country with abundant mineral and nickel resources, therefore there are many mines in Indonesia with the aim of obtaining these mineral and nickel resources. One of the many minerals found in Indonesia is nickel. Indonesia is a country with the largest reserves of nickel ore in the world. Around 23.7% of the world's nickel reserves are in the country (Ministry of Energy and Mineral Resources, 2019). Most of the nickel in Indonesia is found in Central Sulawesi, Southeast Sulawesi and North Maluku. As a result of the large number of nickel reserves in Indonesia, in the future there will be more and more nickel mineral mining in Indonesia. Economic value is all costs including investment costs and a number of costs that can be calculated in monetary terms since entering the productive period until the productive period of the activity ends. The intended economic value is the investment expressed in the form of a money value that will be used as material for the preparation of cash flows consisting of total investment (capital cost), income, operating costs, working capital, depreciation, and others ( Rochmanhadi, 1985). PT. Tonia Mitra Sejahtera is a company engaged in nickel mining and processing which contributes to the world's supply of nickel. PT. Tonia Mitra Sejahtera, has sufficient mechanical equipment operations, so that the daily production target can be achieved. PT. Tonia Mitra Sejahtera targets a nickel ore production target of 1.500.000 tons per year. The benefits in analyzing the economics of mining in opening a mining business in terms of the size of the investment, the feasibility of the investment can be used as an illustration for the costs and economic analysis in opening a nickel mining business. The amount of tangible investment costs at PT. Tonia Mitra Sejahtera $ 16,062,218, intangible investment costs of $ 21,738,006, operational costs of $ 20,932,775/year. From the investment analysis, it was obtained a net present value (NPV) of $25,527,892, a present value ratio (PVR) of 0.68, an internal rate of return of 35.4%, a payback period (PBP) of 2.64 years, and a ratio of 0.6. From these figures, the investment plan to open a nickel mine at PT Tonia Mitra Sejahtera can be implemented. Kata Kunci: Economy, investment, mining, nickel, NPV, IRR, PBP, Ratio.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Ekonomi, investasi, penambangan, nikel, NPV, IRR, PBP, ratio
Subjects: T Technology > TN Mining engineering. Metallurgy > TN263-271 Mineral deposits. Metallic ore deposits. Prospecting
T Technology > TN Mining engineering. Metallurgy > TN400-580 Ore deposits and mining of particular metals
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Andreas Saut Tua Sinaga
Date Deposited: 05 Jun 2023 08:34
Last Modified: 05 Jun 2023 08:34
URI: http://repository.unsri.ac.id/id/eprint/107000

Actions (login required)

View Item View Item