UMUSLI, SUHANNY HABSI and Ibrahim, Eddy and Syarifudin, Syarifudin (2019) ANALISIS TEKNIS PERHITUNGAN PERBANDINGAN VOLUME OVERBURDEN MENGGUNAKAN ALAT SURVEY DENGAN DATA TRUCK COUNT DI PIT ALAM 4 PT. MUARA ALAM SEJAHTERA LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
Preview |
Text
RAMA_31201_03021181520025_0022116203__0004097401_01.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (703kB) | Preview |
Text
RAMA_31201_03021181520025_0022116203__0004097401_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (506kB) | Request a copy |
|
Text
RAMA_31201_03021181520025_0022116203__0004097401_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
|
Text
RAMA_31201_03021181520025_0022116203__0004097401_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (543kB) | Request a copy |
|
Text
RAMA_31201_03021181520025_0022116203__0004097401_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (35kB) | Request a copy |
|
Text
RAMA_31201_03021181520025_0022116203__0004097401_06.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (12kB) | Request a copy |
|
Text
RAMA_31201_03021181520025_0022116203__0004097401_07.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (5MB) | Request a copy |
|
Text
RAMA_31201_03021181520025_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (29MB) | Request a copy |
|
Text
RAMA_31201_03021181520025.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (8MB) | Request a copy |
Abstract
PT. Muara Alam Sejahtera is located in Muara Maung Village, Merapi Barat District, Lahat Regency, South Sumatra. The coal mining process is preceded by overburden excavation or activities carried out before coal getting, in determining the volume of overburden stripping in the Natural pit 4, survey activities and determination of transport equipment ritase. In the survey activities carried out by coordinate measurements of X / easting, Y / northing and Z / elevation using a total station with an area of ± 37 Ha. Furthermore, input in the MineScape software with the cut and fill method to produce overburden stripping volume in January 254,331.85 BCM, February 356,456.11 BCM, March 337,580.9 BCM with a total area of excavation January-March 20.9 Ha. While the volume is determined by the method of transport equipment in January 253,824 BCM, February 328,500 BCM and March 339,132 BCM. The difference between the two methods of measuring overburden volume by using a survey tool with truck count data in the Natural pit 4 from January to March 2019 obtained an average deviation of -2.6% with a standard deviation of 5.92%. The difference between the survey volume and truck count data every week is influenced by the cohesiveness of overburden material.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Survey, Total station, Overburden, Ritase Alat Angkut |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Users 2250 not found. |
Date Deposited: | 08 Oct 2019 02:09 |
Last Modified: | 08 Oct 2019 02:09 |
URI: | http://repository.unsri.ac.id/id/eprint/10739 |
Actions (login required)
View Item |