EVALUASI KEGIATAN PENGEBORAN INTERBURDEN GUNA MENGOPTIMALISASI KETERCAPAIAN TARGET PRODUKSI PELEDAKAN DI PIT 3 TIMUR PENAMBANGAN ELEKTRIFIKASI BANKO BARAT PT BUKIT ASAM,TBK. TANJUNG ENIM, SUMATERA SELATAN

BUDIANTO, ALEXTRON and Hasjim, Machmud and Syarifudin, Syarifudin (2018) EVALUASI KEGIATAN PENGEBORAN INTERBURDEN GUNA MENGOPTIMALISASI KETERCAPAIAN TARGET PRODUKSI PELEDAKAN DI PIT 3 TIMUR PENAMBANGAN ELEKTRIFIKASI BANKO BARAT PT BUKIT ASAM,TBK. TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381419152_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021381419152_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021381419152_02.pdf] Text
RAMA_31201_03021381419152_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (373kB) | Request a copy
[thumbnail of RAMA_31201_03021381419152_03.pdf] Text
RAMA_31201_03021381419152_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (482kB) | Request a copy
[thumbnail of RAMA_31201_03021381419152_04.pdf] Text
RAMA_31201_03021381419152_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (409kB) | Request a copy
[thumbnail of RAMA_31201_03021381419152_05.pdf] Text
RAMA_31201_03021381419152_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (122kB) | Request a copy
[thumbnail of RAMA_31201_03021381419152_06_ref.pdf] Text
RAMA_31201_03021381419152_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (337kB) | Request a copy
[thumbnail of RAMA_31201_03021381419152_07_lamp.pdf] Text
RAMA_31201_03021381419152_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT. Bukit Asam, Tbk. is a state-owned enterprise (BUMN) engaged in the coal industry in South Sumatra. The company conducts mining activities with four operating pits in Site West Banko, namely pit 1, North pit 1, pit 2 and East pit 3. The mining system in East Pit 3 West Bangko uses Conventional mining method that is using a excavator in the form of a power shovel of PC 3000 in the removal of overburden assisted by conveyance in the form of Dumptruck Belaz 75135 and HD 785 for coal removal using PC 400 excavator and tools DT Hino 500 FMPD transport. The Stripping of overburden in east pit 3 was assisted with blasting, it was intended to facilitate the production of power of the PC 3000 power shovel in achieving the planned production targets. Drilling activity is worked out by a unit of Sandvik D245S type drilling equipment owned t Bangko by PT. Dahan in the east Pit 3 West. Based on the planning of the drilling and blasting, the amount of blasting material is 300,000 bcm. But only reached 80.920 bcm or 27% of the April target with cycle time are 5.78 minutes, drilling speed are 1.38 m / min. After scheduling drilling locations at June with an area of 10.82 Ha, based on Minescape 5.7 software, the June volume plan is 768.000 bcm from the previous target of 300,000 bcm, a potential volume increase of 256%.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: West Banko site, fleet, tool productivity, location scheduling, volume addition.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mrs Kharisma Afrianti
Date Deposited: 07 Oct 2019 05:21
Last Modified: 07 Oct 2019 05:21
URI: http://repository.unsri.ac.id/id/eprint/10766

Actions (login required)

View Item View Item