ANALISIS MINE DEWATERING UNTUK AREA BOTTOM PIT DI QUARRY PT SEMEN BATURAJA (PERSERO) TBK SUMATERA SELATAN

MULIA, TAUFIKURRAHMAN and Asyik, Makmur and Bochori, Bochori (2019) ANALISIS MINE DEWATERING UNTUK AREA BOTTOM PIT DI QUARRY PT SEMEN BATURAJA (PERSERO) TBK SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281520135.pdf] Text
RAMA_31201_03021281520135.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021281520135_TURNITIN.pdf] Text
RAMA_31201_03021281520135_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (18MB) | Request a copy
[thumbnail of RAMA_31201_03021281520135_0028125905_0025107401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281520135_0028125905_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Preview
[thumbnail of RAMA_31201_03021281520135_0028125905_0025107401_02.pdf] Text
RAMA_31201_03021281520135_0028125905_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (323kB) | Request a copy
[thumbnail of RAMA_31201_03021281520135_0028125905_0025107401_03.pdf] Text
RAMA_31201_03021281520135_0028125905_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (376kB) | Request a copy
[thumbnail of RAMA_31201_03021281520135_0028125905_0025107401_04.pdf] Text
RAMA_31201_03021281520135_0028125905_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (255kB) | Request a copy
[thumbnail of RAMA_31201_03021281520135_0028125905_0025107401_05.pdf] Text
RAMA_31201_03021281520135_0028125905_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (89kB) | Request a copy
[thumbnail of RAMA_31201_03021281520135_0028125905_0025107401_06_ref.pdf] Text
RAMA_31201_03021281520135_0028125905_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (88kB) | Request a copy
[thumbnail of RAMA_31201_03021281520135_0028125905_0025107401_07_lamp.pdf] Text
RAMA_31201_03021281520135_0028125905_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy

Abstract

Sistem penambangan yang digunakan di PT Semen Baturaja (Persero) Tbk yaitu berupa sistem tambang terbuka (surface mining) dengan metode open pit. Seiring dengan kemajuan tambang, maka akan menghasilkan cekungan yang besar sehingga berpotensi menjadi daerah tampungan air. Berdasarkan perhitungan total debit air yang masuk ke area bottom pit sebesar 24.743,14 m3/hari sedangkan kapasitas aktual dari 4 unit pompa Ebara CN2JA sebesar 676,8 m3/jam dengan total kapasitas pemompaan sebesar 13.536 m3/hari belum mampu untuk mengatasi debit air yang masuk ke area bottom pit. Ketidaksesuaian antara besarnya debit air yang masuk dengan debit air yang dipompakan merupakan dasar diperlukannya penambahan 2 unit pompa HL200M yang memiliki kapasitas aktual sebesar 900 m3/jam untuk dioperasikan. Penggunaan 2 unit pompa Ebara CN2JA dan 2 unit pompa HL200M sudah cukup untuk mengatasi total debit air yang masuk ke area bottom pit dengan durasi jam kerja pompa sebesar 20 jam/hari. Volume air yang ada di area bottom pit saat ini sebesar 82.268 m3, dengan debit air yang masuk ke bottom pit sebesar 24.743,14 m3/hari dan total kapasitas pemompaan dari 4 unit pompa Ebara CN2JA dan 2 unit pompa HL200M sebesar 31.536 m3/hari maka waktu yang diperlukan untuk mengeringkan area bottom pit adalah 13 hari.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Surface mining, bottom, pit, pompa, catcment area, debit air,
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 2357 not found.
Date Deposited: 07 Oct 2019 08:01
Last Modified: 07 Oct 2019 08:01
URI: http://repository.unsri.ac.id/id/eprint/10784

Actions (login required)

View Item View Item