KAJIAN TEKNIS PEMINDAHAN LUMPUR UNTUK OPTIMALISASI PRODUKSI BATUBARA DI AREA SUMP D1 PIT ROTO SELATAN PT KIDECO JAYA AGUNG KABUPATEN PASER, KALIMANTAN TIMUR

AKBAR, AKHMAD SHOBARI and Purbasari, Diana and Puspita, Mega (2022) KAJIAN TEKNIS PEMINDAHAN LUMPUR UNTUK OPTIMALISASI PRODUKSI BATUBARA DI AREA SUMP D1 PIT ROTO SELATAN PT KIDECO JAYA AGUNG KABUPATEN PASER, KALIMANTAN TIMUR. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381924099.pdf] Text
RAMA_31201_03021381924099.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021381924099_TURNITIN.pdf] Text
RAMA_31201_03021381924099_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9MB) | Request a copy
[thumbnail of RAMA_31201_03021381924099_0017048203_0005039303_01_front_ref.pdf] Text
RAMA_31201_03021381924099_0017048203_0005039303_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (575kB)
[thumbnail of RAMA_31201_03021381924099_0017048203_0005039303_02.pdf] Text
RAMA_31201_03021381924099_0017048203_0005039303_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (251kB) | Request a copy
[thumbnail of RAMA_31201_03021381924099_0017048203_0005039303_03.pdf] Text
RAMA_31201_03021381924099_0017048203_0005039303_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (183kB) | Request a copy
[thumbnail of RAMA_31201_03021381924099_0017048203_0005039303_04.pdf] Text
RAMA_31201_03021381924099_0017048203_0005039303_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (355kB) | Request a copy
[thumbnail of RAMA_31201_03021381924099_0017048203_0005039303_05.pdf] Text
RAMA_31201_03021381924099_0017048203_0005039303_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (30kB) | Request a copy
[thumbnail of RAMA_31201_03021381924099_0017048203_0005039303_06_ref.pdf] Text
RAMA_31201_03021381924099_0017048203_0005039303_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (175kB) | Request a copy
[thumbnail of RAMA_31201_03021381924099_0017048203_0005039303_07_lamp.pdf] Text
RAMA_31201_03021381924099_0017048203_0005039303_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT Kideco Jaya Agung is a company engaged in coal mining and uses an open pit mining system. During the rainy season, the flow of water entering the mining area will be mixed with the solid material it is traveling through and stagnate in temporary water storage ponds or sumps, turning it into mud. The coal production process is hampered because the coal to be mined is submerged by water and mud. This study aims to examine the factors that hinder the sludge removal process and their effect on coal production. The observed data are cycle time data of diggers and hauling equipment as well as work efficiency. In the mud transfer process at PT Kideco Jaya Agung, two types of digging equipment are used, namely the Komatsu PC1250SP-8 Excavator and the HY85/160 PC400 Dragflow pump. The methodology used is to calculate and compare the productivity of each digging and hauling equipment. Based on the calculation results, the amount of mud removal in October 2022 was 9,755 m3 for the PC1250 fleet and 82,101 m3 for the Dragflow fleet, while the mud removal target was 140,000 m3 or only 65% of the target. The parameter that causes the amount of mud removal not to be achieved is the lack of work efficiency, which is 25% for the PC1250 fleet and 77% for the Dragflow fleet. Efforts are made to increase work efficiency by maximizing the number of working days and minimizing obstacles that can be avoided. The amount of mud removal after carrying out a simulation of improving work efficiency in October 2022 is 61,507 m3/month on the PC1250 fleet and 86,718 m3/month on the Dragflow fleet so that the total production is 148,225 m3/month.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Pemindahan Lumpur, Produktivitas, Efisiensi Kerja
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Unnamed user with email 03021381924099@student.unsri.ac.id
Date Deposited: 04 Jul 2023 04:43
Last Modified: 04 Jul 2023 04:43
URI: http://repository.unsri.ac.id/id/eprint/113920

Actions (login required)

View Item View Item