ANALISIS ESTIMASI SUMBERDAYA UNTUK PERENCANAAN PENAMBANGAN PADA TAMBANG NIKEL LATERIT BLOK 3A11 PIT ELANG PT. MULIA PASIFIC RESOURCES, MOROWALI UTARA, SULAWESI TENGAH

SIBURIAN, JEREMY KEVIN and Ibrahim, Eddy and Waristian, Harry (2023) ANALISIS ESTIMASI SUMBERDAYA UNTUK PERENCANAAN PENAMBANGAN PADA TAMBANG NIKEL LATERIT BLOK 3A11 PIT ELANG PT. MULIA PASIFIC RESOURCES, MOROWALI UTARA, SULAWESI TENGAH. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281924041.pdf] Text
RAMA_31201_03021281924041.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021281924041_TURNITIN.pdf] Text
RAMA_31201_03021281924041_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021281924041_0022116203_0014058902_01_front_ref.pdf] Text
RAMA_31201_03021281924041_0022116203_0014058902_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021281924041_0022116203_0014058902_02.pdf] Text
RAMA_31201_03021281924041_0022116203_0014058902_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (710kB) | Request a copy
[thumbnail of RAMA_31201_03021281924041_0022116203_0014058902_03.pdf] Text
RAMA_31201_03021281924041_0022116203_0014058902_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281924041_0022116203_0014058902_04.pdf] Text
RAMA_31201_03021281924041_0022116203_0014058902_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281924041_0022116203_0014058902_05.pdf] Text
RAMA_31201_03021281924041_0022116203_0014058902_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (239kB) | Request a copy
[thumbnail of RAMA_31201_03021281924041_0022116203_0014058902_06_ref.pdf] Text
RAMA_31201_03021281924041_0022116203_0014058902_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (306kB) | Request a copy
[thumbnail of RAMA_31201_03021281924041_0022116203_0014058902_07_lamp.pdf] Text
RAMA_31201_03021281924041_0022116203_0014058902_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT. Mulia Pacific Resources in Petasia Area, North Morowali Regime, Focal Sulawesi Territory. This organization has three dynamic blocks, one of which is block 3A11. This block has three pits, including; pits Bravo, Charlie and Delta of the three pits that are as yet working are pit Charlie. In the mean time, the falcon pit is a pit that is found nearby the delta pit. Up to this point, the falcon pit has not been mined or has not been completed in the mining creation process. The issue of this exploration is the distinction in the quantity of assessed assets between organizations with research results and mining arranging assuming that it is practical to mine. For asset assessment, two distinct strategies are utilized, in particular the Reverse Distance Weight technique with the power boundary as an addition so the assessment consequences of the organization utilizing this strategy get an all out weight of overburden and nickel of 139,870 tons while the consequences of the review get a measure of overburden of 54,665 BCM with a sum of 83,230 mineral. WMT (Limonit 56,550 WMT and Saprolit 26,680 WMT) and for the Normal Kriging strategy, how much overburden was 54,810 BCM with metal 83,085 WMT (Limonit 58,145 and Saprolit 24,940 WMT). Hence, further examination was done with respect to the practicality of mining, so a benefit (income) of $ 334,926.17 was gotten in manual computations utilizing Microsoft Succeed while utilizing the SURPAC programming, a benefit (income) of $ 362,411.00 was completed

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Surpac, Inverse Distance Weight, Ordinary Kriging
Subjects: T Technology > TN Mining engineering. Metallurgy > TN263-271 Mineral deposits. Metallic ore deposits. Prospecting
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Jeremy Kevin Siburian
Date Deposited: 14 Jul 2023 07:10
Last Modified: 14 Jul 2023 07:10
URI: http://repository.unsri.ac.id/id/eprint/117127

Actions (login required)

View Item View Item