PERENCANAAN TEKNIS PENAMBANGAN BATUBARA TRIWULAN 1-4 BERDASARKAN RENCANA PRODUKSI TAHUN 2023 DI PT TRIARYANI, MUSI RAWAS UTARA, SUMATERA SELATAN

CANIAGO, WIDYA HALINDA and Toha, M. Taufik and Puspita, Mega (2023) PERENCANAAN TEKNIS PENAMBANGAN BATUBARA TRIWULAN 1-4 BERDASARKAN RENCANA PRODUKSI TAHUN 2023 DI PT TRIARYANI, MUSI RAWAS UTARA, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281924108.pdf] Text
RAMA_31201_03021281924108.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021281924108_TURNITIN.pdf] Text
RAMA_31201_03021281924108_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021281924108_886400016_0005039303_01_front_ref_.pdf] Text
RAMA_31201_03021281924108_886400016_0005039303_01_front_ref_.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021281924108_886400016_0005039303_02.pdf] Text
RAMA_31201_03021281924108_886400016_0005039303_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (277kB) | Request a copy
[thumbnail of RAMA_31201_03021281924108_886400016_0005039303_03.pdf] Text
RAMA_31201_03021281924108_886400016_0005039303_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (513kB) | Request a copy
[thumbnail of RAMA_31201_03021281924108_886400016_0005039303_04.pdf] Text
RAMA_31201_03021281924108_886400016_0005039303_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021281924108_886400016_0005039303_05.pdf] Text
RAMA_31201_03021281924108_886400016_0005039303_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13kB) | Request a copy
[thumbnail of RAMA_31201_03021281924108_886400016_0005039303_06_ref.pdf] Text
RAMA_31201_03021281924108_886400016_0005039303_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13kB) | Request a copy
[thumbnail of RAMA_31201_03021281924108_886400016_0005039303_07_lamp.pdf] Text
RAMA_31201_03021281924108_886400016_0005039303_07_lamp.pdf - Accepted Version
Restricted to Repository staff only

Download (1MB) | Request a copy

Abstract

To plan a coal utilization policy strategy, we need to know about the amount and quality of coal resources and reserves. Because coal is a reliable source for power plants that are widely used and have an economical price, as a result the demand for coal continues to grow, both for domestic and export needs, as well as the widespread use of coal. PT Triaryani is located in North Musi Rawas Regency, South Sumatra Province has a mining business license production operation area of 2143 hectares which has been in production since 2014 has coal resources of 330 million tons of coal in 2021. PT Triaryani in 2023 will increase the production target, so the company needs to make a new mining stage plan starting from the selection of equipment, increasing the number of fleets, and the right mine design that can support the company to achieve production targets. The benefits of planning mining techniques so that mining operations run safely and can meet the company's production targets. From the design obtained overburden that must be removed in the three pits of PT Triaryani in 2023 amounted to 6,196,570.14 bcm and total coal amounted to 3,964,533.82 tons with SR 1.5, in quarter 1 overburden amounted to 1,526,293.22 bcm and 411. 209.48 tons, in quarter 2 overburden amounted to 1,686,791.75 bcm and coal amounted to 1,181,244.52 tons, in quarter 3 overburden amounted to 1,756,865.09 bcm and coal amounted to 899,687.02 tons, in quarter 4 overburden amounted to 1,226,620.07 bcm and coal amounted to 1,472,392.80 tons. Then for planning tools used during 2023 amounted to 8 fleets of overburden tools and 6 fleets of coal getting tools. From the design and planning of equipment, PT Triaryani's mining operations can operate safely and achieve the company's production targets. Keywords: Mine design, mineplan, technical planning, quarterly, stripping ratio.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Desain tambang, mineplan, perencanaan teknis, triwulan, stripping ratio.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
T Technology > TN Mining engineering. Metallurgy > TN799.5-948 Nonmetallic minerals > TN817.S6 Bituminous coal.
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Widya Halinda Caniago
Date Deposited: 26 Jul 2023 02:46
Last Modified: 26 Jul 2023 02:47
URI: http://repository.unsri.ac.id/id/eprint/121464

Actions (login required)

View Item View Item