ANALISIS KEBUTUHAN ARMADA DAN BIAYA OPERASIONAL KENDARAAN (BOK) ANGKUTAN UMUM DI AREAL KAMPUS UNSRI INDRALAYA

MAHARANI, ANNISYA and Rhaptyalyani, Rhaptyalyani (2023) ANALISIS KEBUTUHAN ARMADA DAN BIAYA OPERASIONAL KENDARAAN (BOK) ANGKUTAN UMUM DI AREAL KAMPUS UNSRI INDRALAYA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011181924004.pdf] Text
RAMA_22201_03011181924004.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (20MB) | Request a copy
[thumbnail of RAMA_22201_03011181924004_TURNITIN.pdf] Text
RAMA_22201_03011181924004_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011181924004_0003048506_01_front_ref.pdf] Text
RAMA_22201_03011181924004_0003048506_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (4MB)
[thumbnail of RAMA_22201_03011181924004_0003048506_02.pdf] Text
RAMA_22201_03011181924004_0003048506_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_22201_03011181924004_0003048506_03.pdf] Text
RAMA_22201_03011181924004_0003048506_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_22201_03011181924004_0003048506_04.pdf] Text
RAMA_22201_03011181924004_0003048506_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_22201_03011181924004_0003048506_05.pdf] Text
RAMA_22201_03011181924004_0003048506_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (372kB) | Request a copy
[thumbnail of RAMA_22201_03011181924004_0003048506_06_ref.pdf] Text
RAMA_22201_03011181924004_0003048506_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (397kB) | Request a copy
[thumbnail of RAMA_22201_03011181924004_0003048506_07_lamp.pdf] Text
RAMA_22201_03011181924004_0003048506_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

The University of Sriwijaya (UNSRI) in South Sumatra Province has two main campuses in Indralaya and Palembang. In the Indralaya campus, student mobility is notably high. The use of public transportation fleet is a crucial aspect in supporting student activities. However, issues related to fleet requirements and vehicle operational costs have arisen. UNSRI needs to plan for more optimal public transportation to facilitate students' access to the campus. This research aims to analyze fleet requirements and estimate the Vehicle Operational Costs (BOK) for public transportation within the Indralaya campus area. BOK refers to the total expenses required to operate vehicles, taking various factors into account. With accurate calculations, UNSRI can fulfill students' need for safe, fast, affordable, and convenient public transportation, in line with affordable vehicle operational costs. Optimal fleet requirements can be calculated using the Break Even Point (BEP) method, and Vehicle Operational Costs (BOK) using the DLLAJ method. The components to be calculated to determine vehicle operational costs using the DLLAJ method are direct costs and indirect costs. The analysis results indicate that the current angkot (public minivan) conditions have reached an adequate level with a load factor of 0.32. For the regular route, the optimal fleet size is found to be 154 units out of 180 units. Conversely, for the new route, the optimal fleet size is determined to be 185 units, exceeding the current 180-unit fleet size. The analysis of vehicle operational costs for the regular route is Rp. 223,000, while for the new route, it is Rp. 186,000.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: load factor, Break Even Point, Biaya Operasional Kendaraan (BOK)
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA1001-1280 Transportation engineering
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Users 34011 not found.
Date Deposited: 02 Oct 2023 04:37
Last Modified: 02 Oct 2023 04:37
URI: http://repository.unsri.ac.id/id/eprint/129384

Actions (login required)

View Item View Item