PERENCANAAN TEKNIS DISTRIBUSI AIR MINUM DI IBU KOTA KECAMATAN (IKK) PEMULUTAN BARAT KABUPATEN OGAN ILIR PROVINSI SUMATERA SELATAN

WAHYUNI, WAHYUNI and Haki, Helmi (2012) PERENCANAAN TEKNIS DISTRIBUSI AIR MINUM DI IBU KOTA KECAMATAN (IKK) PEMULUTAN BARAT KABUPATEN OGAN ILIR PROVINSI SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03071001064.pdf] Text
RAMA_22201_03071001064.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (52MB) | Request a copy
[thumbnail of RAMA_22201_03071001064_0003076103_01_front_ref.pdf] Text
RAMA_22201_03071001064_0003076103_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (8MB)
[thumbnail of RAMA_22201_03071001064_0003076103_02.pdf] Text
RAMA_22201_03071001064_0003076103_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (15MB) | Request a copy
[thumbnail of RAMA_22201_03071001064_0003076103_03.pdf] Text
RAMA_22201_03071001064_0003076103_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (940kB) | Request a copy
[thumbnail of RAMA_22201_03071001064_0003076103_04.pdf] Text
RAMA_22201_03071001064_0003076103_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (20MB) | Request a copy
[thumbnail of RAMA_22201_03071001064_0003076103_05.pdf] Text
RAMA_22201_03071001064_0003076103_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (324kB) | Request a copy
[thumbnail of RAMA_22201_03071001064_0003076103_06_ref.pdf] Text
RAMA_22201_03071001064_0003076103_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (376kB) | Request a copy
[thumbnail of RAMA_22201_03071001064_0003076103_07_lamp.pdf] Text
RAMA_22201_03071001064_0003076103_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy

Abstract

Pemulutan district Capital of the is the Southern Sumatra that have limited facilities and inffastructure, especially in terms ofwater supply. With the increase inpopulation from year to year, it is west area in necessary to also increase the quality of water supply, in order to create comfort, stability and environmental hygiene. Provision of drinking water is not separated from the need to pipe - pipe stem that are designed and planned to remainable to meet the needs of drinking water / day maximum in westem pemulutan IKK. Water that has been accommodated disedimentasi then drinking water (treatedwater reservoir), the planned capacity of the reservoir distribution is the basis fordetermining the diameter of the pipe. Planning calculations drinking water distribution pipe lines William Hazen formula. While the balance between the diameter and the flow of water that in the reservoir flows to be used Epanet simulation and using the method of Hardy Cross.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Distribusi air bersih, prasarana, kualitas
Subjects: T Technology > TC Hydraulic engineering. Ocean engineering > TC401-506 River, lake, and water-supply engineering (General)
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Mrs Furika Furika
Date Deposited: 09 Oct 2023 07:33
Last Modified: 09 Oct 2023 07:33
URI: http://repository.unsri.ac.id/id/eprint/129719

Actions (login required)

View Item View Item