ANALISIS GEOMETRI JALAN TAMBANG UNTUK MENINGKATKAN PRODUKTIVITAS ALAT ANGKUT PADA PENAMBANGAN BATUBARA DI PT BUKIT BARA ALAM, LAHAT, SUMATERA SELATAN

AHMAD, IMAM and Mukiat, Mukiat and Purbasari, Diana (2023) ANALISIS GEOMETRI JALAN TAMBANG UNTUK MENINGKATKAN PRODUKTIVITAS ALAT ANGKUT PADA PENAMBANGAN BATUBARA DI PT BUKIT BARA ALAM, LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281924044.pdf] Text
RAMA_31201_03021281924044.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021281924044_TURNITIN.pdf] Text
RAMA_31201_03021281924044_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (17MB) | Request a copy
[thumbnail of RAMA_31201_03021281924044_0022115801_0017048203_01_front_ref.pdf] Text
RAMA_31201_03021281924044_0022115801_0017048203_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021281924044_0022115801_0017048203_02.pdf] Text
RAMA_31201_03021281924044_0022115801_0017048203_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281924044_0022115801_0017048203_03.pdf] Text
RAMA_31201_03021281924044_0022115801_0017048203_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (787kB) | Request a copy
[thumbnail of RAMA_31201_03021281924044_0022115801_0017048203_04.pdf] Text
RAMA_31201_03021281924044_0022115801_0017048203_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021281924044_0022115801_0017048203_05.pdf] Text
RAMA_31201_03021281924044_0022115801_0017048203_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (578kB) | Request a copy
[thumbnail of RAMA_31201_03021281924044_0022115801_0017048203_06_ref.pdf] Text
RAMA_31201_03021281924044_0022115801_0017048203_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (460kB) | Request a copy
[thumbnail of RAMA_31201_03021281924044_0022115801_0017048203_07_lamp.pdf] Text
RAMA_31201_03021281924044_0022115801_0017048203_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

An ideal mine hauling road will optimize production results in accordance with planned production targets. The coal production target at PT Bukit Bara Alam in January and February is 65,000 tons and 61,000 tons, while the actual production is 56,570 tons and 50,819. One of the unattainments is caused by the less than ideal haul road geometry so that the travel time of dump trucks from the mining front to the ROM stock becomes longer. The purpose of this study is to determine the actual dump truck productivity, analyze the comparison of actual haul road geometry conditions with standard haul road geometry, and find out the productivity of dump trucks after repair. Based on the results of the study, a mine hauling road layout design was obtained from the mining front to the ROM stock with 14 segments. The actual haul road geometry has a straight road width between 7-33.6 meters, a bend road width between 7.9-26.4 meters, superelevation between 1.75%-8.75% with a bend radius between 10.213-71.22 meters, a cross slope between 0-5.24%, and a road grade between 0-6.08%. Based on road geometry calculations using AASHTO provisions, there are still many that do not meet the standards. The actual dump truck cycle time (before repair) is 21.74 minutes, while for after repair it is 19.01 minutes. The actual dump truck productivity is 24.327 tons / hour, while after repair it is 27.82 tons / hour. PT Bukit Bara Alam's coal production in March increased from 57,448 tons to 65,698 tons, resulting in a production achievement of 98.05%.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: jalan angkut, dump truck, geometri jalan, cycle time.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Imam Ahmad
Date Deposited: 20 Nov 2023 05:51
Last Modified: 20 Nov 2023 05:51
URI: http://repository.unsri.ac.id/id/eprint/130702

Actions (login required)

View Item View Item