ANALISIS HASIL RIPPING BATUBARA TERHADAP TARGET PRODUKTIVITAS BULLDOZER RIPPER KOMATSU D 375 A DAN EXCAVATOR KOMATSU PC 400 DI PIT TOWN SITE BASECAMP TAMBANG AIR LAYA PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN

AL AZMI, MUHAMMAD FAUZAN and Amin, Muhammad and Waristian, Harry (2023) ANALISIS HASIL RIPPING BATUBARA TERHADAP TARGET PRODUKTIVITAS BULLDOZER RIPPER KOMATSU D 375 A DAN EXCAVATOR KOMATSU PC 400 DI PIT TOWN SITE BASECAMP TAMBANG AIR LAYA PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181823026.pdf] Text
RAMA_31201_03021181823026.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021181823026_TURNITIN.pdf] Text
RAMA_31201_03021181823026_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_31201_03021181823026_0028125905_0010125201_01_front_ref.pdf] Text
RAMA_31201_03021181823026_0028125905_0010125201_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (4MB)
[thumbnail of RAMA_31201_03021181823026_0028125905_0010125201_02.pdf] Text
RAMA_31201_03021181823026_0028125905_0010125201_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021181823026_0028125905_0010125201_03.pdf] Text
RAMA_31201_03021181823026_0028125905_0010125201_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021181823026_0028125905_0010125201_04.pdf] Text
RAMA_31201_03021181823026_0028125905_0010125201_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021181823026_0028125905_0010125201_05.pdf] Text
RAMA_31201_03021181823026_0028125905_0010125201_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (489kB) | Request a copy
[thumbnail of RAMA_31201_03021181823026_0028125905_0010125201_06_ref.pdf] Text
RAMA_31201_03021181823026_0028125905_0010125201_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (568kB) | Request a copy
[thumbnail of RAMA_31201_03021181823026_0028125905_0010125201_07_lamp.pdf] Text
RAMA_31201_03021181823026_0028125905_0010125201_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy

Abstract

PT. Bukit Asam, Tbk. BUMN yang bergerak dalam industri pertambangan batubara yang berada di Tanjung Enim, SumateraaSelatan.aMetodeapenambangannya adalah open pit, penambangan dilakukan dengan menggunakan excavator backhoe, dan alat bulldozer yang dilengkapi ripper. Bulldozer ripper komatsu D 375 A untuk membantu kegiatan ripping batubara yang dapat memudahkan excavator backhoe melakukan penggalian dan pemuatan batubara. Tujuan dari penelitian ini menghitung produktivitas aktual dan perbaikan, menganalisis hasil ripping batubara dan faktor-faktor yang mempengaruhinya serta upaya yang dilakukan untuk mencapai target produktivitas. Metode ripping yang digunakan adalah metode cross ripping karena ripping yang dihasilkan membuat material terberai dengan halus. produktivitas yang direncanakan pada bulldozer 650 Ton/Jam dan excavator 285 Ton/Jam. Produktivitas aktual bulldozer yaitu 630,36 Ton/Jam dan excavator sebesar 269,95 Ton/Jam, dapat diketahui produktivitas aktual belum mencapai target. Produktivitas bulldozer setelah perbaikan yaitu 696,61 Ton/Jam dengan data spasi 1 meter, kedalaman penetrasi 1,4 meter dan cycletime yang dihasilkan oleh excavator saat loading batubara hasil ripping yaitu 19,49 detik sehingga didapatkan produktivitas 292,94 Ton/Jam, dapat diketahui produktivitas setelah perbaikan mencapai target yang direncanakan. Faktor-faktor yang dapat mempengaruhi produktivitas, diantaranya spasi antar ripping, penetrasi kedalaman ripper dan cycle time.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Batubara, Bulldozer, Excavator, Produktivitas, Ripping
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Muhammad Fauzan Al Azmi
Date Deposited: 24 Nov 2023 04:12
Last Modified: 24 Nov 2023 04:12
URI: http://repository.unsri.ac.id/id/eprint/131059

Actions (login required)

View Item View Item