ANALISIS KETERCAPAIAN PENIMBUNAN OVERBURDEN PADA BULAN JANUARI 2023 DI PIT PANDU PT PUTRA MUBA COAL, SUMATERA SELATAN

MAHMUDI, DHEA IQBAL and Ibrahim, Eddy and Bochori, Bochori (2023) ANALISIS KETERCAPAIAN PENIMBUNAN OVERBURDEN PADA BULAN JANUARI 2023 DI PIT PANDU PT PUTRA MUBA COAL, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181924003.pdf] Text
RAMA_31201_03021181924003.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021181924003_TURNITIN.pdf] Text
RAMA_31201_03021181924003_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03021181924003_0022116203_0025107401_01_front_ref.pdf] Text
RAMA_31201_03021181924003_0022116203_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (898kB)
[thumbnail of RAMA_31201_03021181924003_0022116203_0025107401_02.pdf] Text
RAMA_31201_03021181924003_0022116203_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (226kB) | Request a copy
[thumbnail of RAMA_31201_03021181924003_0022116203_0025107401_03.pdf] Text
RAMA_31201_03021181924003_0022116203_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (375kB) | Request a copy
[thumbnail of RAMA_31201_03021181924003_0022116203_0025107401_04.pdf] Text
RAMA_31201_03021181924003_0022116203_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (546kB) | Request a copy
[thumbnail of RAMA_31201_03021181924003_0022116203_0025107401_05.pdf] Text
RAMA_31201_03021181924003_0022116203_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (45kB) | Request a copy
[thumbnail of RAMA_31201_03021181924003_0022116203_0025107401_06_ref.pdf] Text
RAMA_31201_03021181924003_0022116203_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (168kB) | Request a copy
[thumbnail of RAMA_31201_03021181924003_0022116203_0025107401_07_lamp.pdf] Text
RAMA_31201_03021181924003_0022116203_0025107401_07_lamp.pdf - Accepted Version
Restricted to Registered users only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

The overburden dumping plan at PT Putra Muba Coal is designed as a monthly sequential dumping plan based on the established disposal design. There is a discrepancy between the dumping plan and its realization in the field, resulting in inconsistencies in both production and overburden dumping. This study aims to determine the achievement of overburden dumping based on the realization of the dumping sequence, the volume of discrepancies that occurred, the contributing factors, and the efforts that can be undertaken. The achievement of overburden dumping and the volume of discrepancies in dumping are analyzed using MineScape 5.7 software by comparing the dumping sequence in January 2023 with the progress of disposal dumping at the end of January 2023. The achievement of overburden dumping based on the realization of the dumping sequence in Pit Pandu in January 2023 is 63.37% of the target of 698,420.44 BCM, which is 442,585.95 BCM, where 374,097.95 BCM is the area in of plan. The analysis results indicate that the causes of discrepancies are the quantity and placement of fleets that do not align with the plan, lower effective working hours than planned, lower equipment productivity than planned, and suboptimal supervision. Several efforts are proposed to minimize these discrepancies, including minimizing the loss time of excavation and hauling equipment, rescheduling excavation equipment, and improving the effective working time of equipment.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Realisasi, Ketercapaian Produksi, Ketidaksesuaian
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Dhea Iqbal Mahmudi
Date Deposited: 27 Nov 2023 02:25
Last Modified: 27 Nov 2023 02:25
URI: http://repository.unsri.ac.id/id/eprint/131166

Actions (login required)

View Item View Item