ANALISA RISIKO KECELAKAAN KERJA PADA PROYEK PEMBANGUNAN JEMBATAN INTERCHANGE AKSES KTM (KOTA TERPADU MANDIRI) PALEMBANG-INDRLAYA

TANJUNG, MUHAMMAD LADZUARDI and Fitriani, Heni (2019) ANALISA RISIKO KECELAKAAN KERJA PADA PROYEK PEMBANGUNAN JEMBATAN INTERCHANGE AKSES KTM (KOTA TERPADU MANDIRI) PALEMBANG-INDRLAYA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011181320041.pdf] Text
RAMA_22201_03011181320041.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_22201_03011181320041_TURNITIN.pdf] Text
RAMA_22201_03011181320041_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (14MB) | Request a copy
[thumbnail of RAMA_22201_03011181320041_0006057901_01_FRONT_REF.pdf] Text
RAMA_22201_03011181320041_0006057901_01_FRONT_REF.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB)
[thumbnail of RAMA_22201_03011181320041_0006057901_02.pdf] Text
RAMA_22201_03011181320041_0006057901_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (404kB) | Request a copy
[thumbnail of RAMA_22201_03011181320041_0006057901_03.pdf] Text
RAMA_22201_03011181320041_0006057901_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (426kB) | Request a copy
[thumbnail of RAMA_22201_03011181320041_0006057901_04.pdf] Text
RAMA_22201_03011181320041_0006057901_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (510kB) | Request a copy
[thumbnail of RAMA_22201_03011181320041_0006057901_05.pdf] Text
RAMA_22201_03011181320041_0006057901_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (93kB) | Request a copy
[thumbnail of RAMA_22201_03011181320041_0006057901_06_REF.pdf] Text
RAMA_22201_03011181320041_0006057901_06_REF.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (165kB) | Request a copy
[thumbnail of RAMA_22201_03011181320041_0006057901_07_LAMP.pdf] Text
RAMA_22201_03011181320041_0006057901_07_LAMP.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy

Abstract

A construction project is a field that contains risks. Risks can have an influence on productivity, performance, quality and cost constraints of the project. Risk is a result that might occur unexpectedly. Even though an activity has been planned as well as possible, it still contains uncertainty that it will run fully as planned. Risk management is an effort to protect environmental and community workers in a planned, systematic and structured manner as an effort to manage the implementation of K3. The purpose of this study is to identify risk factors that occur in the field, analyze risk assessment, risk index to make the highest risk ranking and formulate risk controls using the JSA method (Job Safety Analysis). This research method uses quantitative methods using a questionnaire to collect data. This study used a sample of respondents as many as 32 people. In processing data, data is tested using analysis of validity and reliability tests. Then analyze the risk assessment from the results of the average likelihood and impact of the AS / NZS 4360 standard risk calculation based on the calculation of the risk index. After obtaining the risk index, then create a risk index grouping and make the highest risk ranking based on the AS / NZS 4360: 2004 Risk Management risk matrix. Based on the data processing carried out, 49 identified risks contained 19 low risks, 25 moderate risks and 5 high risks. Of the overall risks identified the highest risk is reduced vision and respiration due to fumes / smoke during the process of welding pile joints, burns caused by sparks during welding, eye irritation due to welding glare that is too glare, inhaled welding fumes during welding bracing girder, eye irritation when welding bracing girder with a risk value of 12. Risk control that can be carried out in the field, namely the use of PPE, installation of K3 signs, conducting safety induction, and conducting traffic management by the safety officer against workers.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Occupational Safety and Health (K3), AS / NZS 4360: 2004 Risk Management, Risk Management, Job Safety Analysis (JSA)
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
T Technology > TG Bridge engineering > TG1-470 Bridge engineering
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Users 499 not found.
Date Deposited: 31 Jul 2019 05:11
Last Modified: 31 Jul 2019 05:11
URI: http://repository.unsri.ac.id/id/eprint/1359

Actions (login required)

View Item View Item