ANALISIS PEMASANGAN SHOTCRETE FILL RETAINING WALL DENGAN ENGINEERED DRAINAGE SYSTEM OPTION DI TAMBANG BAWAH TANAH BIG GOSSAN PT. FREEPORT INDONESIA

RUMAHORBO, DAVID FERDINAND and Iskandar, Hartini and Asof, Marwan (2011) ANALISIS PEMASANGAN SHOTCRETE FILL RETAINING WALL DENGAN ENGINEERED DRAINAGE SYSTEM OPTION DI TAMBANG BAWAH TANAH BIG GOSSAN PT. FREEPORT INDONESIA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03061002021.pdf] Text
RAMA_31201_03061002021.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (60MB) | Request a copy
[thumbnail of RAMA_31201_03061002021_0007124802_0011115805_01_front_ref.pdf] Text
RAMA_31201_03061002021_0007124802_0011115805_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (10MB)
[thumbnail of RAMA_31201_03061002021_0007124802_0011115805_02.pdf] Text
RAMA_31201_03061002021_0007124802_0011115805_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03061002021_0007124802_0011115805_03.pdf] Text
RAMA_31201_03061002021_0007124802_0011115805_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03061002021_0007124802_0011115805_04.pdf] Text
RAMA_31201_03061002021_0007124802_0011115805_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03061002021_0007124802_0011115805_05.pdf] Text
RAMA_31201_03061002021_0007124802_0011115805_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03061002021_0007124802_0011115805_06.pdf] Text
RAMA_31201_03061002021_0007124802_0011115805_06.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03061002021_0007124802_0011115805_07.pdf] Text
RAMA_31201_03061002021_0007124802_0011115805_07.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03061002021_0007124802_0011115805_08_ref.pdf] Text
RAMA_31201_03061002021_0007124802_0011115805_08_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (413kB) | Request a copy
[thumbnail of RAMA_31201_03061002021_0007124802_0011115805_09_lamp.pdf] Text
RAMA_31201_03061002021_0007124802_0011115805_09_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy

Abstract

PT Freeport Indonesia saat ini sedang melaksanakan konstruksipaste backfill plant dengan kapasitas 240 ton perjam yang terletak di Big Gossan Copper & Gold Mine Papua, Indonesia dan dijadwalkan memproduksi paste mulai Januari 201L Plant tersebut berada di underground mine di atas ore body dan paste didistribusikan menggunakan system UDS (Underground Distribution System) ke area produksi yaitu dengan gravitasi dan bantuan pompa. Untuk mewujudkan tambang underground dengan metode BackfUling yang aman dibutuhkan retaining wali atau bulkheadyang kokoh. Jikapersyaratan tersebut tidak dapat dipenuhi maka akan menimbulkan kondisi yang tidak aman dan dapat mengakibatkan kegagalan pada retaining wali. Kegagalan retaining wali tersebut juga berkaitan dengan kerugian secara ekonomi, korban jiwa, dan gangguan terhadap produksi. Tambang Big Gossan memutuskan untuk menggunakan design shotcrete modifikasi dengan system drainase pada retaining wali tersebut. Dalam pelaksanaannya, dibutuhkan pemasangan wali shotcrete yang cepat dengan tujuan agar stope yang telah ada bisa segera di isi sehingga tidak terjadi subsidence jika dibiarkan lama. Sesuai dengan target yang ingin dicapai tahun 2011 saat dilakukan produksi besar-besaran bahwa setiap bulan diharapkan ada 10 wali yang terpasang. Tetapi, berdasarkan pengalaman yang telah dilakukan sebelumnya, untuk satu wali dibutuhkan 21 shift (21 hari). Hal ini sangat jauh dari apa yang diharapkan Oleh sebab itu diperlukan analisis proses pemasangan shotcrete wali yang meliputi analisis waktu pemasangan, teknologi serta bahan dan material yang diperlukan agar proses pemasangannya dapat dilakukan tepat waktu. Kata kunci : tambang bawah tanah, retaining wall, system drainase

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: tambang bawah tanah, retaining wall, system drainase
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mrs. Elly Suryani
Date Deposited: 16 Feb 2024 02:07
Last Modified: 16 Feb 2024 02:07
URI: http://repository.unsri.ac.id/id/eprint/140861

Actions (login required)

View Item View Item