SAIYA, JB DHARMA and Komar, Syamsul and Prabu, Ubaidillah Anwar (2017) EVALUASI KINERJA SIPHON STRING PADA SUMUR X-28 LAPANGAN Y PT. PERTAMINA EP ASSET 3 CIREBON, JAWA BARAT. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31201_03121002087.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (24MB) | Request a copy |
|
Text
RAMA_31201_03121002087_0018105502_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (5MB) |
|
Text
RAMA_31201_03121002087_0018105502_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (4MB) | Request a copy |
|
Text
RAMA_31201_03121002087_0018105502_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_31201_03121002087_0018105502_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (4MB) | Request a copy |
|
Text
RAMA_31201_03121002087_0018105502_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (249kB) | Request a copy |
|
Text
RAMA_31201_03121002087_0018105502_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (248kB) | Request a copy |
|
Text
RAMA_31201_03121002087_0018105502_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (8MB) | Request a copy |
Abstract
PT. Pertamina EP Asset 3 have a many optimization project in one time. There are two ways of optimization work for achievement of production targets set by PT. Pertamina EP Asset 3. Optimization Project work with Well Intervention (Intervensi Sumur) to increase production, in which case no one uses Rig Service such as Acidizing, Fraci'uring, Surfactant, etc. There also are not used rig (Rigless), by adding tubing by inserting Siphon String. Then Optimization job that does not require Rig is Siphon String Installation. Oil Recovery that by use Siphon String will be more optimal. In theory, using Siphon String can be increase production until 100%, it can be seen from IPR and OPR Curve Nodai Analysis results by looking at the sensitivity Tubing. It happens because in X-28 is a Natural Flow wells that produce intermittent. Intermittent where the production cycle and Shut-In cycle conducted sequentially in the respective period of time. Average production before installation Siphon String is 20 BFPD, after Siphon String Installation production is continuous flowing cmd increase production up to 90% to 38 BFPD.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Natural Flow, IPR, Tubing, Siphon String, Nodai Analysis. |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Mrs Furika Furika |
Date Deposited: | 23 Feb 2024 04:15 |
Last Modified: | 23 Feb 2024 04:15 |
URI: | http://repository.unsri.ac.id/id/eprint/141044 |
Actions (login required)
View Item |