EVALUASI KINERJA CRUSHING PLANT PADA TAMBANG ANDESIT UNTUK MENCAPAI TARGET PRODUKSI 8000 TON/BULAN PADA BULAN MEI 2016 DI PT ANSAR TERANG CRUSHINDO KABUPATEN LIMAPULUH KOTA SUMATRA BARAT

REZA, REZA and Komar, Syamsul and Ningsih, RR. Yunita Bayu (2016) EVALUASI KINERJA CRUSHING PLANT PADA TAMBANG ANDESIT UNTUK MENCAPAI TARGET PRODUKSI 8000 TON/BULAN PADA BULAN MEI 2016 DI PT ANSAR TERANG CRUSHINDO KABUPATEN LIMAPULUH KOTA SUMATRA BARAT. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03121002048.pdf] Text
RAMA_31201_03121002048.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (39MB) | Request a copy
[thumbnail of RAMA_31201_03121002048_0023037813_01_front_ref.pdf] Text
RAMA_31201_03121002048_0023037813_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (10MB)
[thumbnail of RAMA_31201_03121002048_0023037813_02.pdf] Text
RAMA_31201_03121002048_0023037813_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03121002048_0023037813_03.pdf] Text
RAMA_31201_03121002048_0023037813_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03121002048_0023037813_04.pdf] Text
RAMA_31201_03121002048_0023037813_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_31201_03121002048_0023037813_05.pdf] Text
RAMA_31201_03121002048_0023037813_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (819kB) | Request a copy
[thumbnail of RAMA_31201_03121002048_0023037813_06_ref.pdf] Text
RAMA_31201_03121002048_0023037813_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (620kB) | Request a copy
[thumbnail of RAMA_31201_03121002048_0023037813_07_lamp.pdf] Text
RAMA_31201_03121002048_0023037813_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy

Abstract

PT .Ansar Terang Ccrushindo is a company of Andesite mining. Monthly target production set by the company is 8000 tons/month. Andesite rock processed by using crushing plant to improve the selling price. On May 2016 the target has not been fulfilled .There are several factors which cause unfullfilled target of production. Productivity of mechanical instrument depends on capacity and cycle time. It will affect to efficiency and effectiveness of instrument. Then will do research on technical study of crushing unit plant in andesite mining to achieve production target amount of 8000 tons / months on may 2016 at PTAnsar Terang Crushindo in district Limapuluh Kota West Sumatra. The study is done by combining between the literature with field observation data. The research data ware taken is primary and secondary which are consist of the feeding rate, amount of products produced, daily working schedule, rainfall, instrument specifications, monthly production target and monthly report of operations . The data processed by calculation and presented in the form of table and diagram with narrative to explain the data. The result showed the efficiency of crushing plant in May 2016 was only 42,22 % so the crushing plant only produce 285 tons/day of product. The effectiveness of crushing plant is 98,46 %. It’s counted as good because the percentage of losses for its operations only 1,54 % .The use of availability crushing plant is 68,20% that made the burden of production become 123,476 tons / hours. This number exceeds the capacity of instrument so for long periods would cause a damaged. We can conclude that effectiveness of working time crushing plant is very low. It’s the reason of unfullfilled monthly production target. To fullfill the production target of we need to be repaired.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Crushing Plant, Efficiency, Effectiveness, Use of Availability, Productivity
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Mrs Furika Furika
Date Deposited: 22 Mar 2024 03:19
Last Modified: 22 Mar 2024 03:19
URI: http://repository.unsri.ac.id/id/eprint/142002

Actions (login required)

View Item View Item