GULTOM, RIMHOT P. and Yusuf, Maulana and Abro, M. Akib (2016) KAJIAN TEKNIS SISTEM PENIRISAN TAMBANG DALAM PENANGGULANGAN AIR LIMPASAN DI SUMP DI PT. DIZAMATRA POWERINDO DESA KEBUR KECAMATAN MERAPI BARAT KABUPATEN LAHAT. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31201_03091002074.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (30MB) | Request a copy |
|
Text
RAMA_31201_03091002074_0025095903_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (8MB) |
|
Text
RAMA_31201_03091002074_0025095903_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (8MB) | Request a copy |
|
Text
RAMA_31201_03091002074_0025095903_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_31201_03091002074_0025095903_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (3MB) | Request a copy |
|
Text
RAMA_31201_03091002074_0025095903_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (347kB) | Request a copy |
|
Text
RAMA_31201_03091002074_0025095903_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (401kB) | Request a copy |
|
Text
RAMA_31201_03091002074_0025095903_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (7MB) | Request a copy |
Abstract
PT . Dizamatra Powerindo is a privately owned coal mining company that is domestic investment located West Merapi, District of Lahat. The method of mining conduced PT. Dizamatra Powerindo is surface mining. Hence, the weather become an important factors to be considerated especially in the rany season so the mining activities would go well.Today, the catchment area is about 39,88 Ha. Based on data from the field, the pit currently stagnated by water amounted to 150.700 cu m. Using Armor Pump PM 6L with capacity up to 360 cu m in pumping system yet still not capable to pumped the water out of sump, the sump which esisted yet still be able to accomodate the incoming water, so that the pit stagnated by big amount of water. Therefore needs a dewatering technical review in order to make mining activities can be resumed properly. The thing that needs to be examined in this case is water entering the sump, pump and volume of existing sump. To overcome water in pit, could be used pump with capacity up to 720 cu m to replace the last one. Volume of the designe sump amounted to 54,000 cu m.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Rainfall, Catchment area. Pump, Sump. |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Mrs Furika Furika |
Date Deposited: | 25 Mar 2024 02:22 |
Last Modified: | 25 Mar 2024 02:22 |
URI: | http://repository.unsri.ac.id/id/eprint/142417 |
Actions (login required)
View Item |