PRA RENCANA PABRIK PEMBUATAN 1,3-BUTADIENA KAPASITAS 105.000 TON/TAHUN

Aziz, M. Alik and Rudy M, Patrick and Komariah, Leily Nurul (2018) PRA RENCANA PABRIK PEMBUATAN 1,3-BUTADIENA KAPASITAS 105.000 TON/TAHUN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_01.front_ref.pdf]
Preview
Text
RAMA_24201_03031181419164_03031281419080_0026037502_01.front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (14MB) | Preview
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_02.pdf] Text
RAMA_24201_03031181419164_03031281419080_0026037502_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (350kB) | Request a copy
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_03.pdf] Text
RAMA_24201_03031181419164_03031281419080_0026037502_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (642kB) | Request a copy
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_04.pdf] Text
RAMA_24201_03031181419164_03031281419080_0026037502_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (334kB) | Request a copy
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_05.pdf] Text
RAMA_24201_03031181419164_03031281419080_0026037502_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (316kB) | Request a copy
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_06.pdf] Text
RAMA_24201_03031181419164_03031281419080_0026037502_06.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (576kB) | Request a copy
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_07.pdf] Text
RAMA_24201_03031181419164_03031281419080_0026037502_07.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (345kB) | Request a copy
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_08.pdf] Text
RAMA_24201_03031181419164_03031281419080_0026037502_08.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (254kB) | Request a copy
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_09.pdf] Text
RAMA_24201_03031181419164_03031281419080_0026037502_09.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (59kB) | Request a copy
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_06.pdf]
Preview
Text
RAMA_24201_03031181419164_03031281419080_0026037502_06.pdf

Download (576kB) | Preview
[thumbnail of RAMA_24201_03031181419164_03031281419080_0026037502_10_lamp.pdf] Text
RAMA_24201_03031181419164_03031281419080_0026037502_10_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy

Abstract

Pabrik pembuatan 1,3-Butadiena dari 1-Butena dengan kapasitas 105.000 ton/tahun direncanakan berdiri pada tahun 2023 di Cilegon, Provinsi Banten yang diperkirakan memiliki luas area sebesar 4,5 Ha. Proses pembuatan butadiena dengan jenis reaktor fixed bed (R-01) dengan katalis ZnFe2O4. Kondisi operasi pembuatan butadiena adalah 375oC dan tekanan 2 atm. Pabrik pembuatan 1,3- Butadiena ini berbentuk Perseroan Terbatas (PT) yang pimpinannya adalah Direktur Utama. Sistem organisasi perusahaan ini adalah line and staff dengan jumlah karyawan sebanyak 163 orang. Hasil dari analisa ekonomi Pra-rencana Pabrik Pembuatan 1,3-Butadiena sebagai berikut: • Total Capital Investment = US $ 107.476.433,94 • Selling Price per Year = US $ 241.735.100,24 • Total Production Cost = US $ 179.872.670,63 • Annual Cash Flow = US $ 51.901.815,44 • Pay Out time = 2,6 tahun • Rate of Return = 40,29% • Discounted Cash Flow = 47,77 % • Break Even Point = 36,30 % • Service Life = 11 tahun

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: 1,3-Butadiena, Analisa Ekonomi, Pabrik, Spesifikasi Peralatan
Subjects: T Technology > TP Chemical technology > TP155-156 Chemical engineering > TP155.5P4 Chemical plants--Design and construction
T Technology > TP Chemical technology > TP250-261 Industrial electrochemistry
Divisions: 03-Faculty of Engineering > 24201-Chemical Engineering (S1)
Depositing User: Users 12 not found.
Date Deposited: 01 Nov 2019 03:27
Last Modified: 01 Nov 2019 03:27
URI: http://repository.unsri.ac.id/id/eprint/14242

Actions (login required)

View Item View Item