RE-EVALUASI TEKNIS DAN BIAYA KEGIATAN RENCANA PASCA TAMBANG PADA LAHAN BEKAS TAMBANG BATUBARA DI PT. BATUBARA BUKIT KENDI, SUMATERA SELATAN

NOVARINDA, HILDHA and Toha, M. Taufik and Yusuf, Maulana (2024) RE-EVALUASI TEKNIS DAN BIAYA KEGIATAN RENCANA PASCA TAMBANG PADA LAHAN BEKAS TAMBANG BATUBARA DI PT. BATUBARA BUKIT KENDI, SUMATERA SELATAN. Masters thesis, Sriwijaya University.

[thumbnail of RAMA_31101_03042622327006.pdf] Text
RAMA_31101_03042622327006.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_31101_03042622327006_TURNITIN.pdf] Text
RAMA_31101_03042622327006_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (16MB) | Request a copy
[thumbnail of RAMA_31101_03042622327006_8864000016_0025095903_03.pdf] Text
RAMA_31101_03042622327006_8864000016_0025095903_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (336kB) | Request a copy
[thumbnail of RAMA_31101_03042622327006_8864000016_0025095903_front_ref.pdf] Text
RAMA_31101_03042622327006_8864000016_0025095903_front_ref.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31101_03042622327006_8864000016_0025095903_05.pdf] Text
RAMA_31101_03042622327006_8864000016_0025095903_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9kB) | Request a copy
[thumbnail of RAMA_31101_03042622327006_8864000016_0025095903_06_ref.pdf] Text
RAMA_31101_03042622327006_8864000016_0025095903_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12kB) | Request a copy
[thumbnail of RAMA_31101_03042622327006_8864000016_0025095903_02.pdf] Text
RAMA_31101_03042622327006_8864000016_0025095903_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31101_03042622327006_8864000016_0025095903_04.pdf] Text
RAMA_31101_03042622327006_8864000016_0025095903_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31101_03042622327006_8864000016_0025095903_07_lamp.pdf] Text
RAMA_31101_03042622327006_8864000016_0025095903_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (958kB) | Request a copy

Abstract

PT. Batubara Bukit Kendi (PT. BBK) is one of the companies that supplies coal with an area of 881.70 hectares (448.37 Ha is Protected Forest Area and 433.33 Ha is Production Forest Area). PT. The BBK mentioned above is a company that uses the open pit mining method (strip mining). This mining operation begins with land clearing activities, stripping top soil and overburden. Mining is carried out by dismantling, loading and transporting and then reclamation activities are carried out to post-mining activities. This research aims to evaluate the technical aspects and examine several variables that will be worked on to obtain a good post-mining activity plan in order to approximate the initial shape and use for the surrounding community as well as calculating cost optimization in order to achieve the objectives of the technical aspects of activities that have been determined for the activity. after the mine. In this thesis report, the results were obtained from discussions regarding the post-mining activity plans of PT. Bukit Kendi Coal is divided into 3 parts, namely the mine support facilities will be dismantled and reclaimed and then revegetated with sengon and durian plants. The mining road has not yet been dismantled because from 2020 to 2025 the PT BBK road is still being used by PT Prima Mulia Sarana Sejahtera (PT PMSS) as a hauling road and the area is being used as a project site by PT PMSS. Meanwhile, for void PT. BBK will be used as a fish cultivation pond in the north void and a water storage pond in the south void. The optimal cost for the series of post-mining activities mentioned above is Rp. 33,469,846,681. 846,681,- (Says: Thirty-three billion four hundred and sixty-nine eight hundred forty-six thousand six hundred and eighty-one rupiah).

Item Type: Thesis (Masters)
Uncontrolled Keywords: teknis, biaya, pascatambang, batubara
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31101-Mining Engineering (S2)
Depositing User: Hildha Novarinda
Date Deposited: 05 Jul 2024 05:57
Last Modified: 05 Jul 2024 05:57
URI: http://repository.unsri.ac.id/id/eprint/149521

Actions (login required)

View Item View Item