ANALISIS REKONSILIASI PENAMBANGAN NIKEL LATERIT BERDASARKAN MONTHLY SCHEDULLING DI PIT SAMAENRE E PT CERIA NUGRAHA INDOTAMA, KABUPATEN KOLAKA, SULAWESI TENGGARA

INDRAWAN, MUHAMMAD DWITRI CANDIKA and Ibrahim, Eddy and Prabu, Ubaidillah Anwar (2024) ANALISIS REKONSILIASI PENAMBANGAN NIKEL LATERIT BERDASARKAN MONTHLY SCHEDULLING DI PIT SAMAENRE E PT CERIA NUGRAHA INDOTAMA, KABUPATEN KOLAKA, SULAWESI TENGGARA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282025044.pdf] Text
RAMA_31201_03021282025044.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (5MB) | Request a copy
[thumbnail of RAMA_31201_03021282025044_TURNITIN.pdf] Text
RAMA_31201_03021282025044_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (52MB) | Request a copy
[thumbnail of RAMA_31201_03021282025044_0022116203_9990445896_01_front_ref.pdf] Text
RAMA_31201_03021282025044_0022116203_9990445896_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB)
[thumbnail of RAMA_31201_03021282025044_0022116203_9990445896_02.pdf] Text
RAMA_31201_03021282025044_0022116203_9990445896_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282025044_0022116203_9990445896_03.pdf] Text
RAMA_31201_03021282025044_0022116203_9990445896_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (260kB) | Request a copy
[thumbnail of RAMA_31201_03021282025044_0022116203_9990445896_04.pdf] Text
RAMA_31201_03021282025044_0022116203_9990445896_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282025044_0022116203_9990445896_05.pdf] Text
RAMA_31201_03021282025044_0022116203_9990445896_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (135kB) | Request a copy
[thumbnail of RAMA_31201_03021282025044_0022116203_9990445896_06_ref.pdf] Text
RAMA_31201_03021282025044_0022116203_9990445896_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (139kB) | Request a copy
[thumbnail of RAMA_31201_03021282025044_0022116203_9990445896_07_lamp.pdf] Text
RAMA_31201_03021282025044_0022116203_9990445896_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy

Abstract

One of the companies that has produce Laterit Nickel Mining Industry is PT Ceria Nugraha Indotama located in Wolo, Kolaka Regency, Southeast Sulawesi. PT Ceria Nugraha Indotama is a mining company that has abundant natural resources and implements sustainable practises. At pit Samaenre E it has been declared mined out. In the pit that has been mined out, it is necessary to reconcile (comparison between the plan and the actual mining) to get an analysis of “why can be difference?” and not be repeated a mistake in the next pit. Therefore, this is the background of this research. Reconciliation is not only comparing between plan and actual but can also be collaborated with mining schedulling. This research aims to evaluate the schedulling per period of a Mining pit which will later be used for reconciliation also. Mining schedulling made in the Geovia Minesched software which has previously been calculated reserve in the Geovia Surpac. The results of this schedulling can be a reference to make a sequence per period and can also maximise mining results through the optimal mining direction. In the estimated reserves calculated, there is an estimated reserve of 218.445-tons with a Ni content of 1.59%. In the results of the schedule at pit Samaenre E, it is scheduled to be mined out in 7 periods with stagnant ore and optimal levels each period. In the mined block model, there is 172,473-ton of mined ore with a Ni content of 1.56%. And in the actual calculation through the checker there is a mined ore of 224.205-tons with a Ni content of 1.67%. The result is a reconciliation of schedulling with the actual calculation of 103%, and the reconciliation of the block model with the actual calculation of 130% with each grade recovery >100%. My recommendation in this company is doing a schedulling calculations using Geovia Minesched for making a mining sequences per period is more optimal and more maximised in terms of selective mining so that there is no overcut that produces a lot of overburden.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Reserve Estimation, Schedulling, Reconcilliation
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
T Technology > TN Mining engineering. Metallurgy > TN263-271 Mineral deposits. Metallic ore deposits. Prospecting
T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
T Technology > TN Mining engineering. Metallurgy > TN400-580 Ore deposits and mining of particular metals
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Muhammad Dwitri Indrawan Candika
Date Deposited: 18 Jul 2024 05:21
Last Modified: 18 Jul 2024 06:40
URI: http://repository.unsri.ac.id/id/eprint/151530

Actions (login required)

View Item View Item