OPTIMALISASI CADANGAN MARGINAL BATUBARA MENGGUNAKAN METODE AUGER MINING PADA PT. BUKIT ASAM, TBK DALAM PENERAPAN ASPEK KONSERVASI BATUBARA

SAN, M FUAD FAKHRI and Toha, M. Taufik and Hadi, Alek Al (2024) OPTIMALISASI CADANGAN MARGINAL BATUBARA MENGGUNAKAN METODE AUGER MINING PADA PT. BUKIT ASAM, TBK DALAM PENERAPAN ASPEK KONSERVASI BATUBARA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282025081.pdf] Text
RAMA_31201_03021282025081.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_31201_03021282025081_TURNITIN.pdf] Text
RAMA_31201_03021282025081_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (14MB) | Request a copy
[thumbnail of RAMA_31201_03021282025081_8864000016_0001069008_01_front_ref.pdf] Text
RAMA_31201_03021282025081_8864000016_0001069008_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021282025081_8864000016_0001069008_02.pdf] Text
RAMA_31201_03021282025081_8864000016_0001069008_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282025081_8864000016_0001069008_03.pdf] Text
RAMA_31201_03021282025081_8864000016_0001069008_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (500kB) | Request a copy
[thumbnail of RAMA_31201_03021282025081_8864000016_0001069008_04.pdf] Text
RAMA_31201_03021282025081_8864000016_0001069008_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282025081_8864000016_0001069008_05.pdf] Text
RAMA_31201_03021282025081_8864000016_0001069008_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (133kB) | Request a copy
[thumbnail of RAMA_31201_03021282025081_8864000016_0001069008_06_ref.pdf] Text
RAMA_31201_03021282025081_8864000016_0001069008_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (247kB) | Request a copy
[thumbnail of RAMA_31201_03021282025081_8864000016_0001069008_07_lamp.pdf] Text
RAMA_31201_03021282025081_8864000016_0001069008_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT. Bukit Asam, Tbk is a company that is actively engaged in coal mining. One of the pits owned by PT. Bukit Asam, Tbk, namely Pit 2 Banko Barat, will reach its economic limit, so a reserve conservation plan is needed in an effort to maximize the reserves in Pit 2 Banko Barat. The reserve optimization plan is the implementation of mining using the auger mining method as a reserve maximization. This study aims to help PT. Bukit Asam, Tbk to analyze Pit 2 Banko Barat as a potential target area and the feasibility of a conservation plan using the auger mining method. The research method used is the quantitative method. Based on the results of the research conducted, the mining design using the auger mining method meets the standards starting from Pit 2 Banko Barat which meets the standards as a potential location, then the mining geometry meets safety standards, and meets the standards in economic feasibility. Seam A1 has a pillar width of 1.5 m with FK 1.34, Seam A2 has a pillar width of 1.3 m with FK 1.31, Seam B1 has a pillar width of 1.6 m with FK 1.41, Seam B2 has a pillar width of 1.6 m with FK 1.36, Seam C has a pillar width of 1.8 with FK 1.42. The capital cost of this project is $ 9,216,144 and the operating cost starts from $ 11.59/ton in 2028, $ 11.75/ton in 2029, $ 11.68/ton in 2030, $ 11.98/ton in 2031 to $ 12.10/ton in 2032. The cash flow in this conservation plan is $ 23,699,637, so the Net Present Value of this project is $ 8,411,366 and the Internal Rate of Return is 38%. Therefore, this auger mining project is declared feasible for operation.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Konservasi, Cadangan Marginal, Auger Mining
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: M Fuad Fakhri SAN
Date Deposited: 23 Jul 2024 01:58
Last Modified: 23 Jul 2024 01:58
URI: http://repository.unsri.ac.id/id/eprint/152070

Actions (login required)

View Item View Item