ANALISIS PENENTUAN ISIAN BAHAN PELEDAK MAKSIMUM DAN DELAY PADA BLASTING UNTUK MENGONTROL GROUND VIBRATION DI PIT BENGGERIS, PT THIESS CONTRACTORS INDONESIA

SITUMEANG, WINDA MARTA ULI and Syarifudin, Syarifudin and Al Hadi, Alek (2024) ANALISIS PENENTUAN ISIAN BAHAN PELEDAK MAKSIMUM DAN DELAY PADA BLASTING UNTUK MENGONTROL GROUND VIBRATION DI PIT BENGGERIS, PT THIESS CONTRACTORS INDONESIA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282025050.pdf] Text
RAMA_31201_03021282025050.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03021282025050_TURNITIN.pdf] Text
RAMA_31201_03021282025050_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (18MB) | Request a copy
[thumbnail of RAMA_31201_03021282025050_0004097401_0001069008_01_front_ref.pdf] Text
RAMA_31201_03021282025050_0004097401_0001069008_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB)
[thumbnail of RAMA_31201_03021282025050_0004097401_0001069008_02.pdf] Text
RAMA_31201_03021282025050_0004097401_0001069008_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (779kB) | Request a copy
[thumbnail of RAMA_31201_03021282025050_0004097401_0001069008_03.pdf] Text
RAMA_31201_03021282025050_0004097401_0001069008_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (491kB) | Request a copy
[thumbnail of RAMA_31201_03021282025050_0004097401_0001069008_04.pdf] Text
RAMA_31201_03021282025050_0004097401_0001069008_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282025050_0004097401_0001069008_05.pdf] Text
RAMA_31201_03021282025050_0004097401_0001069008_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (109kB) | Request a copy
[thumbnail of RAMA_31201_03021282025050_0004097401_0001069008_06_ref.pdf] Text
RAMA_31201_03021282025050_0004097401_0001069008_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (123kB) | Request a copy
[thumbnail of RAMA_31201_03021282025050_0004097401_0001069008_07_lamp.pdf] Text
RAMA_31201_03021282025050_0004097401_0001069008_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy

Abstract

PT Thiess Contractors Indonesia is a multinational company that provides contracting services for coal mining. In the process of removing overburden using blasting techniques, it certainly produces waste energy, one of which is ground vibration. The results of ground vibration measurements in November-December 2023 exceeded 2 mm/second, exceeding the threshold of Kep-49/MENLH/11/1996. This has the potential to cause negative impacts on the environment if not controlled. This study aims to compare ground vibration predictions from the USBM, Langefors-Kihlstrom, and Ambraseys-Hendron equations with actual data, and determine the maximum explosive charge and optimal delay period to control ground vibration. The research method uses a quantitative approach with data in the form of Peak Particle Velocity, number of explosive charges, and distance to obtain the scaled distance value and determine the value of K and e in the prediction equation. The results show that the USBM method is more accurate in predicting ground vibration. The maximum explosive charge recommendation using the USBM method with a 95% confidence level at a distance of 200 m from residential areas is 3 kg. Longer distances allow an increase in the amount of explosives according to the calculation. Based on simulations in SHOTplus software, the optimal delay period recommendation is 67 ms as a control row while for echelon using 42 ms or 109 ms or can also use a control row of 109 ms and a delay period of 42 ms or 67 ms, both using 100 blast holes and 60 blast holes.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Ground Vibration, Peak Particle Velocity, Delay Period
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Unnamed user with email 03021282025050@student.unsri.ac.id
Date Deposited: 31 Jul 2024 04:31
Last Modified: 31 Jul 2024 04:31
URI: http://repository.unsri.ac.id/id/eprint/153632

Actions (login required)

View Item View Item