SN, DENTA ANDIKA and Ibrahim, Eddy and Suwardi, Fuad Rusydi (2015) KAJIAN TEKNIS GEOMETRI JALAN PRODUKSI FRONT LOADING COAL GETTING PIT C SAMPAI KE STOCK ROM 2 DAN PENGARUHNYA TERHADAP OPTIMALISASI PRODUKSI DUMP TRUK DI PT. DUTA ALAM SUMATERA, LAHAT - SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
Preview |
Text
RAMA_31201_03101002041_0022116203_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (108kB) | Preview |
Text
RAMA_31201_03101002041_0022116203_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (119kB) | Request a copy |
|
Text
RAMA_31201_03101002041_0022116203_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (33kB) | Request a copy |
|
Text
RAMA_31201_03101002041_0022116203_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (114kB) | Request a copy |
|
Text
RAMA_31201_03101002041_0022116203_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (21kB) | Request a copy |
|
Text
RAMA_31201_03101002041_0022116203_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (11kB) | Request a copy |
|
Text
RAMA_31201_03101002041_0022116203_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (477kB) | Request a copy |
Abstract
PT. Duta Alam Sumatera is coal company engaged in coal mining village located Payo, District of West Merapi, Lahat - South Sumatra. Mining system used is surface mining. One of the factors that affect the productivity of the production tool is used. The haul road of good is the road that can give a moving optimum for operating vehicles. Production road that connects the front loading into the stock rom 2 is ± 1500 meters. Haul Road in PT. Duta Alam Sumatera Selatan consists of 19 segments ranging from the straight path, the path bends, road uphill and downhill roads. Coal Getting plan in PT. Duta Alam Sumatera Selatan month amounted to 41.546 tonnes /month. But for the actual conditions of production 2 units PC 400 LC excavator and 8 units of dump trucks Nissan CWB is at 30.599,2 tonnes / month so that production targets will not be achieved. So with the improvement of road geometry production in a straight line from the segment M - stock rom 2 with a width of 10,08 meters, and the width of the road bends to the segment Q - P - O and O - N - M with a width of 13 meters, in addition to the the making of a cross slope of 20.2 cm and manufacture of uperelevation on the street corner in segment Q - P - O and O - N - M is 0,11, the height difference between the inside and the outside must be made of 1,31 meters, and the production of road maintenance by using 2 units PC 400 LC excavator and 8 units of dump trucks Nissan CWB 45 production amounted to 42.301,6 tonnes / month, so that the production target is reached.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Geometry Road, Productivity, Cross Slope, Superelevasi, Surface Mining, Coal Getting |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Users 2701 not found. |
Date Deposited: | 12 Nov 2019 16:09 |
Last Modified: | 12 Nov 2019 16:09 |
URI: | http://repository.unsri.ac.id/id/eprint/15560 |
Actions (login required)
View Item |