EVALUASI KONDISI JALAN TAMBANG DALAM MENUNJANG PRODUKTIVITAS ALAT ANGKUT BATUBARA DI PT BHUMI SRIWIJAYA PERDANA COAL

PRIYAMANDA, IMEL and Asof, Marwan and Pebrianto, Rosihan (2024) EVALUASI KONDISI JALAN TAMBANG DALAM MENUNJANG PRODUKTIVITAS ALAT ANGKUT BATUBARA DI PT BHUMI SRIWIJAYA PERDANA COAL. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021182025011.pdf] Text
RAMA_31201_03021182025011.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021182025011_TURNITIN.pdf] Text
RAMA_31201_03021182025011_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03021182025011_0011115805_0010029003_01_front_ref.pdf] Text
RAMA_31201_03021182025011_0011115805_0010029003_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (736kB)
[thumbnail of RAMA_31201_03021182025011_0011115805_0010029003_02.pdf] Text
RAMA_31201_03021182025011_0011115805_0010029003_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (453kB) | Request a copy
[thumbnail of RAMA_31201_03021182025011_0011115805_0010029003_03.pdf] Text
RAMA_31201_03021182025011_0011115805_0010029003_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (202kB) | Request a copy
[thumbnail of RAMA_31201_03021182025011_0011115805_0010029003_04.pdf] Text
RAMA_31201_03021182025011_0011115805_0010029003_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (882kB) | Request a copy
[thumbnail of RAMA_31201_03021182025011_0011115805_0010029003_05.pdf] Text
RAMA_31201_03021182025011_0011115805_0010029003_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (129kB) | Request a copy
[thumbnail of RAMA_31201_03021182025011_0011115805_0010029003_06_ref.pdf] Text
RAMA_31201_03021182025011_0011115805_0010029003_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12kB) | Request a copy
[thumbnail of RAMA_31201_03021182025011_ 0011115805_0010029003_07_Lamp.pdf] Text
RAMA_31201_03021182025011_ 0011115805_0010029003_07_Lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (883kB) | Request a copy

Abstract

PT Bhumi Sriwijaya Perdana Coal is one of the mining companies engaged in the coal industry, located in Beji Mulyo Village, Tungkal jaya district, Musi Banyuasin Regency, South Sumatera Province. In Januari 2024, the coal production target at PT Bhumi Sriwijaya Perdana Coal was 100.000 tons/month, but the realization only reached 71,314 ton/month. One of the fators causing the non-achievement of production targets is the mismatch of road conditiont with standards, which result in an increase in the cycletime of the conveyance and a decrease in coal productivity. This study aims to evaluatu the condition of the haul road in order to reduce the cycle time of the hauling equipment and increase productivity so that the production target can be achieved. The condition of the haul road at PT Bhumi Sriwijaya Perdana Coal still does not meet the AASHTO theoretical standards, as evidences by the results of field measurements. The straight road width ranges from 9,91 to 23,51 meters, while the bend ranges from 5,20 to 20,53 meters , while AASHTO theory suggest a straigets road width of 12,14 meters and a bend of 14,71 meters, Nevertheless, the slope of the haul road at PT Bhumi Sriwijaya Perdana Coal is quite safe, except for segment A-B, D-E, and O-P which still exceed 8% of the standard slope according to AASHTO. Improvement, the cycle time of the dump truck was 13 minutes, but after the improvement it became 9,11 minutes. The actual productivity of 1 unit dump truck was 25,79 tons/hour, which increased to 36,78 tons/hour after road improvement, and the total production of dump trucks after road improvement reached 101.704 tons/month.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Jalan angkut, Produtivitas, Alat angkut, Grade, Superelevasi.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Imel Priyamanda
Date Deposited: 02 Sep 2024 03:03
Last Modified: 02 Sep 2024 03:03
URI: http://repository.unsri.ac.id/id/eprint/156338

Actions (login required)

View Item View Item