ANDERSON, MARKUS YON and Purbasari, Diana and Syarifuddin, Syarifuddin (2024) PERENCANAAN TEKNIS SEQUENCE PENAMBANGAN BATUBARA DENGAN TARGET 750.000 TON PADA PIT EAGLE TRIWULAN (II, III, IV) TAHUN 2024 DI PT TRIARYANI, KABUPATEN MURATARA, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
Text
RAMA_31201_03021282025052.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (6MB) | Request a copy |
|
Text
RAMA_31201_03021282025052_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (19MB) | Request a copy |
|
Text
RAMA_31201_03021282025052_0017048203_0004097401_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) |
|
Text
RAMA_31201_03021282025052_0017048203_0004097401_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (297kB) | Request a copy |
|
Text
RAMA_31201_03021282025052_0017048203_0004097401_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (276kB) | Request a copy |
|
Text
RAMA_31201_03021282025052_0017048203_0004097401_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
|
Text
RAMA_31201_03021282025052_0017048203_0004097401_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (94kB) | Request a copy |
|
Text
RAMA_31201_03021282025052_0017048203_0004097401_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (157kB) | Request a copy |
|
Text
RAMA_31201_03021282025052_0017048203_0004097401_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
Abstract
PT Triaryani is a company engaged in mining, which is located in North Musirawas Regency, South Sumatra Province. The area of Mining Business License (IUP) owned by Pt. Triaryani is 2134 ha. PT Triaryani experienced a target non achievement in the first quarter of 2024. so it is necessary to re-plan in order to support the achievement of production in 2024. Planning the mining sequence in the pit and disposal is carried out in Minescape 5.7 software. After obtaining the appropriate sequence design, proceed with designing the need for excavation and transportation equipment. Quarter 2 as much as 1,102,676.00 bcm of overburden with 270,016.00 tons of coal SR 4.08 with 5 loader units and 26 hauler units. Quarter 3 as much as 1,129,388.00 bcm of overburden with total coal of 286,272.00 tons of SR 3.95 with 5 units of loaders and 28 units of haulers. Quarter 4 as much as 1,129,388.00 bcm of overburden with a total of 286,272.00 tons of SR 3.95 coal with 4 units of loaders and 27 units of haulers. The disposal design in 2024 can accommodate 3,156,112.08 bcm. In the second quarter the disposal can accommodate 1,132,389.43 bcm with an area of 32.88 Ha. In the third quarter the disposal can accommodate as much as 1,204,389.43 bcm with an area of 56.83 Ha. In the fourth quarter the disposals
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Design, Disposal, fleet, Batubara, Overburden, Squence. |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Markus Yon Anderson |
Date Deposited: | 18 Dec 2024 06:10 |
Last Modified: | 18 Dec 2024 06:10 |
URI: | http://repository.unsri.ac.id/id/eprint/160765 |
Actions (login required)
View Item |