EVALUASI REALISASI PENAMBANGAN BERDASARKAN RENCANA PRODUKSI DI PT PRIAMANAYA ENERGI KABUPATEN LAHAT, SUMATERA SELATAN

ALFREDO, DIPPOS SAMUEL and Bochori, Bochori and Mukiat, Mukiat (2024) EVALUASI REALISASI PENAMBANGAN BERDASARKAN RENCANA PRODUKSI DI PT PRIAMANAYA ENERGI KABUPATEN LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021382025101.pdf] Text
RAMA_31201_03021382025101.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021382025101_TURNITIN.pdf] Text
RAMA_31201_03021382025101_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (8MB) | Request a copy
[thumbnail of RAMA_31201_03021382025101_0025107401_0022115801_01_front_ref.pdf] Text
RAMA_31201_03021382025101_0025107401_0022115801_01_front_ref.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (730kB) | Request a copy
[thumbnail of RAMA_31201_03021382025101_0025107401_0022115801_02.pdf] Text
RAMA_31201_03021382025101_0025107401_0022115801_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (256kB) | Request a copy
[thumbnail of RAMA_31201_03021382025101_0025107401_0022115801_03.pdf] Text
RAMA_31201_03021382025101_0025107401_0022115801_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (422kB) | Request a copy
[thumbnail of RAMA_31201_03021382025101_0025107401_0022115801_04.pdf] Text
RAMA_31201_03021382025101_0025107401_0022115801_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021382025101_0025107401_0022115801_05.pdf] Text
RAMA_31201_03021382025101_0025107401_0022115801_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (180kB) | Request a copy
[thumbnail of RAMA_31201_03021382025101_0025107401_0022115801_06_ref.pdf] Text
RAMA_31201_03021382025101_0025107401_0022115801_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (155kB) | Request a copy
[thumbnail of RAMA_31201_03021382025101_0025107401_0022115801_07_lamp.pdf] Text
RAMA_31201_03021382025101_0025107401_0022115801_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT Priamanaya Energi is a company engaged in mining and selling coal commodities. At PT Priamanaya Energi, mining is planned to follow the mining sequence. However, the implementation of mining shows differences between the actual conditions in the field and the mining sequence. This study aims to evaluate the extent to which production is in accordance with the mining plan, identify locations that experience differences, analyze the causes, and assess the impact and steps that can be taken. By overlaying the mining sequences and actuals in the field using Minescape 5.7, overcut and undercut calculations will be obtained. Based on the mining sequence, PT Priamanaya Energi's production achievement in February was 39.53% of 109,486 tons, namely 43,287 tons of coal, and 37.86% of 643,657 BCM, namely 243,713 BCM for overburden, so that the overcut results for coal and overburden were 1,173 tons and 6,515 BCM, respectively, and the undercut areas of coal and overburden were 66,199 tons and 399,944 BCM, respectively. Factors causing non-conformance with the design include the effective working time of the overburden digger that is less than planned, the productivity of the equipment that does not reach the target, and the lack of attention to elevation benchmarks. To overcome this problem, several steps can be taken, improving supervision of mining directions, improving operator performance and discipline, and ensuring that mining stakes are in accordance with the plan.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Sekuen, Ketercapaian Produksi, Realisasi
Subjects: T Technology > TN Mining engineering. Metallurgy > TN263-271 Mineral deposits. Metallic ore deposits. Prospecting
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Dippos Samuel Alfredo Silaban
Date Deposited: 20 Dec 2024 07:11
Last Modified: 20 Dec 2024 07:11
URI: http://repository.unsri.ac.id/id/eprint/160995

Actions (login required)

View Item View Item