EVALUASI PERENCANAAN BIAYA REKLAMASI BERDASARKAN KAJIAN TEKNIS PADA TAMBANG BATUBARA DI PT. FIRMAN KETAUN,BENGKULU UTARA

RAMADHAN, MUHAMMAD DZAKY PUTRA and Yusuf, Maulana and Juniah, Restu (2024) EVALUASI PERENCANAAN BIAYA REKLAMASI BERDASARKAN KAJIAN TEKNIS PADA TAMBANG BATUBARA DI PT. FIRMAN KETAUN,BENGKULU UTARA. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282025028.pdf] Text
RAMA_31201_03021282025028.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9MB) | Request a copy
[thumbnail of RAMA_31201_03021282025028_TURNITIN.pdf] Text
RAMA_31201_03021282025028_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (55MB) | Request a copy
[thumbnail of RAMA_31201_03021282025028_0025095903_0027066701_01_front_ref.pdf] Text
RAMA_31201_03021282025028_0025095903_0027066701_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB)
[thumbnail of RAMA_31201_03021282025028_0025095903_0027066701_02.pdf] Text
RAMA_31201_03021282025028_0025095903_0027066701_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282025028_0025095903_0027066701_03.pdf] Text
RAMA_31201_03021282025028_0025095903_0027066701_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021282025028_0025095903_0027066701_04.pdf] Text
RAMA_31201_03021282025028_0025095903_0027066701_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (913kB) | Request a copy
[thumbnail of RAMA_31201_03021282025028_0025095903_0027066701_05.pdf] Text
RAMA_31201_03021282025028_0025095903_0027066701_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (336kB) | Request a copy
[thumbnail of RAMA_31201_03021282025028_0025095903_0027066701_06_ref.pdf] Text
RAMA_31201_03021282025028_0025095903_0027066701_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (416kB) | Request a copy
[thumbnail of RAMA_31201_03021282025028_0025095903_0027066701_07_lamp.pdf] Text
RAMA_31201_03021282025028_0025095903_0027066701_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy

Abstract

Reclamation is an effort to restore land affected by mining activities to restore ecological and environmental functions according to their designation. This process involves landscaping, revegetation and management of mine water quality. In mining, reclamation is a company obligation that must be carried out in accordance with regulations, such as the Minister of Energy and Mineral Resources Decree No. 1827/K/30/MEM/2018. Evaluating reclamation cost planning is essential to ensure the effectiveness and efficiency of implementation, while identifying operational constraints and the need for budget adjustments. This study evaluates the reclamation cost planning of a coal mine in PT Firman Ketaun, North Bengkulu, for the period 2021-2025. The focus is on the reclamation of 71 hectares of land, which includes the arrangement of 142,000 m³ of material for 842.77 hours, the spreading of 213,000 m³ of topsoil for 3,044.17 hours, the construction of 17 drainage channels in 52.71 hours, and a sediment pond with a capacity of 5,358.31 m³ requiring 122.83 hours. Revegetation was planned by planting 62,126 pioneer and insertion trees, and adding 0.05 kg/m³ of lime to neutralize acid mine drainage. Evaluation results showed the total reclamation cost was Rp 8.665.245.690, consisting of direct costs of Rp 6.741.125.358 and indirect costs of Rp 1.924.120.331,21. Factors such as lack of topsoil, fast-draining soil, weather changes, and livestock disturbance affect the effectiveness of reclamation. Even so, PT Firman Ketaun's reclamation cost planning is in accordance with MEMR Decree No. 1827/K/30/MEM/2018.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Reklamasi, Evaluasi, Perencanaan, Biaya, Regulasi
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Muhammad Dzaky Putra Ramadhan
Date Deposited: 07 Jan 2025 06:39
Last Modified: 07 Jan 2025 06:39
URI: http://repository.unsri.ac.id/id/eprint/162541

Actions (login required)

View Item View Item