ANALISIS KESTABILAN DAN PROBABILITAS KELONGSORAN LERENG TIMBUNAN DENGAN METODE LIMIT EQUILIBRIUM PADA BACKFILL PIT X PT BUKIT ASAM TBK SUMATERA SELATAN.

ANGGORO, FAHREZI IBNU and Toha, M.Taufik and Bochori, Bochori (2025) ANALISIS KESTABILAN DAN PROBABILITAS KELONGSORAN LERENG TIMBUNAN DENGAN METODE LIMIT EQUILIBRIUM PADA BACKFILL PIT X PT BUKIT ASAM TBK SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021382025116.pdf] Text
RAMA_31201_03021382025116.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy
[thumbnail of RAMA_31201_03021382025116_TURNITIN.pdf] Text
RAMA_31201_03021382025116_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11MB) | Request a copy
[thumbnail of RAMA_31201_03021382025116_8864000016_0025107401_01_front_ref.pdf] Text
RAMA_31201_03021382025116_8864000016_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021382025116_8864000016_0025107401_02.pdf] Text
RAMA_31201_03021382025116_8864000016_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021382025116_8864000016_0025107401_03.pdf] Text
RAMA_31201_03021382025116_8864000016_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (708kB) | Request a copy
[thumbnail of RAMA_31201_03021382025116_8864000016_0025107401_04.pdf] Text
RAMA_31201_03021382025116_8864000016_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021382025116_8864000016_0025107401_05.pdf] Text
RAMA_31201_03021382025116_8864000016_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (135kB) | Request a copy
[thumbnail of RAMA_31201_03021382025116_8864000016_0025107401_06_ref.pdf] Text
RAMA_31201_03021382025116_8864000016_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (135kB) | Request a copy
[thumbnail of RAMA_31201_03021382025116_8864000016_0025107401_07_lamp.pdf] Text
RAMA_31201_03021382025116_8864000016_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy

Abstract

Slope stability is an important factor in the sustainability of the mining process, a stable slope will reduce the potential for losses due to landslides. Analysis of the stability of backfilling slopes is considered very necessary, because landslides on backfilling slopes can cause quite large losses, both equipment loss and loss of life as well as lost opportunities. It is known that changes in berm play an important role in stability because they can affect the FK and PoF values. Embankment slopes are relatively more susceptible to landslides than in-situ material slopes because the embankment slope structure is less dense and its composition is different from in-situ material slopes. The research results show a relationship between changes in slope geometry, namely berm lengths of 20 meters, 25 meters, 30 meters, 35 meters, 40 meters. Several variations were carried out to increase the berm width which resulted in changes in the FK and PoF values. The longer the berm width, the greater the FK and PoF values of the slope. The analysis results show that the ideal berm width used is 40 meters in Section A-A' and 40 meters in section B-B' with an FK value for section A-A' of 1,379 having a PoF (3,25 %) while for section B-B' an FK value of 1.274 has a PoF (7 .75%).

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: backfilling, berm, slope stability, safety factor
Subjects: T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Fahrezi Ibnu Anggoro
Date Deposited: 09 Jan 2025 02:44
Last Modified: 09 Jan 2025 02:44
URI: http://repository.unsri.ac.id/id/eprint/162632

Actions (login required)

View Item View Item