ANALISIS SISTEM PROTEKSI KEBAKARAN DI PT. MUBA ELECTRIC POWER KABUPATEN MUSI BANYUASIN

FAADHIL, MUHAMMAD ABDURRAHMAN and Waldani, Dina (2025) ANALISIS SISTEM PROTEKSI KEBAKARAN DI PT. MUBA ELECTRIC POWER KABUPATEN MUSI BANYUASIN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_13201_10011382126147_Cover.jpg]
Preview
Image
RAMA_13201_10011382126147_Cover.jpg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (279kB) | Preview
[thumbnail of RAMA_13201_10011382126147.pdf] Text
RAMA_13201_10011382126147.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_13201_10011382126147_TURNITIN.pdf] Text
RAMA_13201_10011382126147_TURNITIN.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy
[thumbnail of RAMA_13201_10011382126147_1027078802_01_front_ref.pdf] Text
RAMA_13201_10011382126147_1027078802_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (626kB)
[thumbnail of RAMA_13201_10011382126147_1027078802_02.pdf] Text
RAMA_13201_10011382126147_1027078802_02.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (562kB) | Request a copy
[thumbnail of RAMA_13201_10011382126147_1027078802_03.pdf] Text
RAMA_13201_10011382126147_1027078802_03.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (27kB) | Request a copy
[thumbnail of RAMA_13201_10011382126147_1027078802_04.pdf] Text
RAMA_13201_10011382126147_1027078802_04.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_13201_10011382126147_1027078802_05.pdf] Text
RAMA_13201_10011382126147_1027078802_05.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (146kB) | Request a copy
[thumbnail of RAMA_13201_10011382126147_1027078802_06.pdf] Text
RAMA_13201_10011382126147_1027078802_06.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12kB) | Request a copy
[thumbnail of RAMA_13201_10011382126147_1027078802_07_ref.pdf] Text
RAMA_13201_10011382126147_1027078802_07_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (167kB) | Request a copy
[thumbnail of RAMA_13201_10011382126147_1027078802_08_lamp.pdf] Text
RAMA_13201_10011382126147_1027078802_08_lamp.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy

Abstract

PT. Muba Electric Power merupakan perusahaan di Kabupaten Musi Banyuasin yang bergerak di bidang penyediaan listrik. Dalam menjalankan tugasnya, perusahaan ini mengemban risiko yang cukup tinggi terkait insiden kebakaran. Oleh karena itu, dibutuhkan penerapan sistem proteksi kebakaran yang baik dan dapat melindungi gedung utama PT. Muba Electric Power dari insiden kebakaran. Penelitian ini bertujuan untuk menganalisis penerapan sistem proteksi kebakaran di PT. Muba Electric Power Kabupaten Musi Banyuasin. Penelitian ini merupakan penelitian kualitatif dengan melakukan wawancara mendalam kepada 7 informan. Penentuan informan menggunakan teknik purposive sampling dengan menggunakan 3 jenis informan, yaitu informan utama, informan kunci, dan informan pendukung. Hasil penelitian menunjukkan bahwa sistem proteksi kebakaran aktif yang berada di PT. Muba Electric Power Kabupaten berupa APAR (70%) dan sumber air (akses pasokan air) (80%). Sedangkan, sistem proteksi kebakaran pasif yang berada di PT. Muba Electric Power Kabupaten berupa jalur evakuasi (70%), pintu darurat (50%), petunjuk arah (75%), titik kumpul (100%), dan bangunan (100%). Secara keseluruhan, sistem proteksi kebakaran yang berada di PT. Muba Electric Power mendapatkan skor 45,5% (kurang). Saran yang dapat diberikan kepada pihak PT. Muba Electric Power, yakni melakukan diskusi bersama semua pihak terkait pengadaan sistem proteksi kebakaran yang belum tersedia, seperti alarm, detektor, sprinkler, hydrant, dan tangga darurat.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Kebakaran, Sistem Proteksi, Perusahaan
Subjects: R Medicine > RA Public aspects of medicine > RA428-428.5 Public health laboratories, institutes, etc.
Divisions: 10-Faculty of Public Health > 13201-Public Health (S1)
Depositing User: Muhammad Abdurrahman Faadhil
Date Deposited: 18 Mar 2025 02:14
Last Modified: 18 Mar 2025 02:14
URI: http://repository.unsri.ac.id/id/eprint/169173

Actions (login required)

View Item View Item