ANALISIS STUDI FAKTOR KEPADATAN HAULING ROAD TRAFFIC UNTUK MENINGKATKAN KETERCAPAIAN TARGET PRODUKSI BATUBARA DI PT BERAU COAL, BERAU, KALIMANTAN TIMUR

ALFIANSYAH, ARIF and Purbasari, Diana and Sari, Eva Oktarina (2025) ANALISIS STUDI FAKTOR KEPADATAN HAULING ROAD TRAFFIC UNTUK MENINGKATKAN KETERCAPAIAN TARGET PRODUKSI BATUBARA DI PT BERAU COAL, BERAU, KALIMANTAN TIMUR. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021282025066_Cover.jpeg] Image
RAMA_31201_03021282025066_Cover.jpeg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (182kB)
[thumbnail of RAMA_31201_03021282025066.pdf] Text
RAMA_31201_03021282025066.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021282025066_TURNITIN.pdf] Text
RAMA_31201_03021282025066_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (14MB) | Request a copy
[thumbnail of RAMA_31201_03021282025066_0017048203_0015109006_01_front_ref.pdf] Text
RAMA_31201_03021282025066_0017048203_0015109006_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (844kB)
[thumbnail of RAMA_31201_03021282025066_0017048203_0015109006_02.pdf] Text
RAMA_31201_03021282025066_0017048203_0015109006_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (439kB) | Request a copy
[thumbnail of RAMA_31201_03021282025066_0017048203_0015109006_03.pdf] Text
RAMA_31201_03021282025066_0017048203_0015109006_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (249kB) | Request a copy
[thumbnail of RAMA_31201_03021282025066_0017048203_0015109006_04.pdf] Text
RAMA_31201_03021282025066_0017048203_0015109006_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (623kB) | Request a copy
[thumbnail of RAMA_31201_03021282025066_0017048203_0015109006_05.pdf] Text
RAMA_31201_03021282025066_0017048203_0015109006_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (16kB) | Request a copy
[thumbnail of RAMA_31201_03021282025066_0017048203_0015109006_06_ref.pdf] Text
RAMA_31201_03021282025066_0017048203_0015109006_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (125kB) | Request a copy
[thumbnail of RAMA_31201_03021282025066_0017048203_0015109006_07_lamp.pdf] Text
RAMA_31201_03021282025066_0017048203_0015109006_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (573kB) | Request a copy

Abstract

PT Berau Coal is a mining company in Indonesia engaged in coal exploration and sales. This research was conducted on the coal transportation route at Binungan Mine Operation Site 1, which applies an open pit mining system. After mining, the coal is sent to the processing facility at the Binungan Coal Processing Plant (CPP) before continuing to the Suaran CPP using a Scania R580-Double SST74 Side Dump Truck. The hauling path used in this transportation is the focus of the study. In the first quarter, the performance of coal transportation from Binungan to Suaran has not reached the set target. In addition, there was an increase in production from 14 million tons to 15 million tons this year. The non-achievement of the production target is influenced by various factors that affect the productivity of operational units, both at the loading and transportation stages. Based on calculations, hauling equipment is still unable to achieve the planned production target of 974,918 tons per month. Some of the factors that contribute to transportation productivity include road geometry, road width, cross slope, loading site conditions, grade, traffic density, match factor, and work efficiency. However, this research specifically focuses on the causal factors and solutions to overcome traffic congestion on coal hauling routes.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Cycle Time, Production, Hauling Road Traffic.
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Arif Alfiansyah
Date Deposited: 21 Apr 2025 05:28
Last Modified: 21 Apr 2025 05:28
URI: http://repository.unsri.ac.id/id/eprint/170384

Actions (login required)

View Item View Item