ANALISIS FAKTOR PENGHAMBAT DAN STRATEGI IMPLEMENTASI KONSEP GREEN CONSTRUCTION PADA PERUSAHAAN KONTRAKTOR DI KOTA PALEMBANG

SARI, RACHELYA AYU PUSPITA and Fitriani, Heni (2025) ANALISIS FAKTOR PENGHAMBAT DAN STRATEGI IMPLEMENTASI KONSEP GREEN CONSTRUCTION PADA PERUSAHAAN KONTRAKTOR DI KOTA PALEMBANG. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011282126050_cover.jpg]
Preview
Text
RAMA_22201_03011282126050_cover.jpg - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (405kB) | Preview
[thumbnail of RAMA_22201_03011282126050.pdf] Text
RAMA_22201_03011282126050.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_22201_03011282126050_TURNITIN.pdf] Text
RAMA_22201_03011282126050_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_22201_03011282126050_0006057901_01_front_ref.pdf] Text
RAMA_22201_03011282126050_0006057901_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (4MB)
[thumbnail of RAMA_22201_03011282126050_0006057901_02.pdf] Text
RAMA_22201_03011282126050_0006057901_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (564kB) | Request a copy
[thumbnail of RAMA_22201_03011282126050_0006057901_03.pdf] Text
RAMA_22201_03011282126050_0006057901_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (534kB) | Request a copy
[thumbnail of RAMA_22201_03011282126050_0006057901_04.pdf] Text
RAMA_22201_03011282126050_0006057901_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (540kB) | Request a copy
[thumbnail of RAMA_22201_03011282126050_0006057901_05.pdf] Text
RAMA_22201_03011282126050_0006057901_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (179kB) | Request a copy
[thumbnail of RAMA_22201_03011282126050_0006057901_06_ref.pdf] Text
RAMA_22201_03011282126050_0006057901_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (198kB) | Request a copy
[thumbnail of RAMA_22201_03011282126050_0006057901_07_lamp.pdf] Text
RAMA_22201_03011282126050_0006057901_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy

Abstract

Global warming and extreme climate change have become urgent issues across many parts of the world, including Indonesia. The construction industry is responsible for a significant portion of resource consumption and pollution emissions, contributing approximately 30% to 50% of global carbon emissions. Therefore, the implementation of sustainable building construction practices is essential to reduce carbon emissions throughout the building life cycle. The green construction concept has emerged as a solution that emphasizes resource efficiency and environmental impact reduction throughout the entire life cycle of a building. The Indonesian government has adopted this approach through the “Indonesia Construction 2030” agenda and regulations related to green building standards. Palembang, as one of the cities undergoing rapid development, requires an evaluation of how this concept is being implemented by local contractors. However, the practical application of green construction in the city remains limited. Hence, this study is necessary to identify the main inhibiting factors and formulate applicable strategies to encourage the adoption of green construction. The research was conducted by distributing questionnaires to 50 contractor companies in Palembang and resulted in the identification of five major inhibiting factors along with five key strategies to overcome these challenges.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Konsep Green Construction, Bangunan Berkelanjutan Kontraktor, Implementasi, Faktor Hambatan, Strategi
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Rachelya Ayu Puspita Sari
Date Deposited: 08 May 2025 07:50
Last Modified: 08 May 2025 07:50
URI: http://repository.unsri.ac.id/id/eprint/171838

Actions (login required)

View Item View Item