FADHIL, MUHAMMAD RAIHAN and Juliantina, Ika (2025) ANALISIS PENGENDALIAN WAKTU DAN BIAYA MENGGUNAKAN METODE FAST TRACK PADA PROYEK PENGGANTIAN JEMBATAN AIR SERAMI KABUPATEN OGAN KOMERING ILIR. Undergraduate thesis, Sriwijaya University.
![]() ![]() Preview |
Image
RAMA_22201_03011282025033_cover.jpg - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (253kB) | Preview |
![]() |
Text
RAMA_22201_03011282025033.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (5MB) | Request a copy |
![]() |
Text
RAMA_22201_03011282025033_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (10MB) | Request a copy |
![]() |
Text
RAMA_22201_03011282025033_0001076005_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (3MB) |
![]() |
Text
RAMA_22201_03011282025033_0001076005_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (550kB) | Request a copy |
![]() |
Text
RAMA_22201_03011282025033_0001076005_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (321kB) | Request a copy |
![]() |
Text
RAMA_22201_03011282025033_0001076005_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
![]() |
Text
RAMA_22201_03011282025033_0001076005_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (204kB) | Request a copy |
![]() |
Text
RAMA_22201_03011282025033_0001076005_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (152kB) | Request a copy |
![]() |
Text
RAMA_22201_03011282025033_0001076005_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
Abstract
This study evaluates the Fast Track method's effectiveness in optimizing time and cost management for the Air Serami Bridge replacement project in South Sumatra's Ogan Komering Ilir Regency. Through Precedence Diagram Method (PDM) and Microsoft Project analysis, the research demonstrates how parallel task execution with Start-to-Start scheduling reduced project duration by 4 days (2.22%) and saved IDR 7.7 million (0.11%) in indirect costs while maintaining direct costs, though requiring enhanced coordination and risk management. The findings highlight Fast Track's potential for infrastructure projects in developing regions, suggesting future integration of BIM and AI technologies for improved efficiency in time-constrained construction projects with limited budgets.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Fast Track, PDM, Microsoft Project, percepatan proyek, pengendalian biaya. |
Subjects: | T Technology > TA Engineering (General). Civil engineering (General) > TA177.4-185 Engineering economy |
Divisions: | 03-Faculty of Engineering > 22201-Civil Engineering (S1) |
Depositing User: | Muhammad Raihan Fadhil |
Date Deposited: | 20 May 2025 02:40 |
Last Modified: | 20 May 2025 02:40 |
URI: | http://repository.unsri.ac.id/id/eprint/173136 |
Actions (login required)
![]() |
View Item |