FRANSISKA, CICILLIA and JULIKA, KESYA and Melwita, Elda (2025) PRA RANCANGAN PABRIK PEMBUATAN PROPIL ASETAT KAPASITAS 190.000 TON/TAHUN. Undergraduate thesis, Sriwijaya University.
![]() ![]() Preview |
Image
RAMA_24201_03031182126012_03031282126056_cover.jpg Download (122kB) | Preview |
![]() |
Text
RAMA_24201_03031182126012_03031282126056.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (7MB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (12MB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (407kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (216kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (100kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (249kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_06.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (234kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_07.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (262kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_08.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (291kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_09.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (21kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_10_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (57kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126012_03031282126056_0011057504_11_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (4MB) | Request a copy |
Abstract
Pabrik pembuatan Propil Asetat dengan kapasitas produksi 190.000 ton/tahun direncanakan akan berdiri pada tahun 2030 di Jalan Asia Raya, Citangkil, Kota Cilegon, Provinsi Banten dengan luas 12 ha. Propil Asetat pada pabrik ini disintesis dari bahan baku Asam Asetat dan Propanol menggunakan katalis tanah liat putih yang dimodifikasi dengan asam p-toluenesulfonat dalam Multitubular Fixed bed reactor berdasarkan Patent CN116751123A. Reaksi berlangsung pada temperatur 158,9oC dan tekanan 0,394 atm. Pabrik ini berbentuk Perseroan Terbatas (PT) dengan sistem organisasi line and staff yang dipimpin oleh seorang direktur dengan karyawan sebanyak 151 orang. Pabrik Propil Asetat layak untuk didirikan karena telah memenuhi parameter kelayakan ekonomi: Investasi = US $ 67.153.409,41 Hasil penjualan per tahun = US $ 408.806.885,92 Biaya produksi per tahun = US $ 301.264.886,09 Laba bersih per tahun = US $ 81.383.644,79 Pay out time = 1,114 tahun Rate of return on investment = 89,68% Discounted cash flow = 94,17% Break even point = 30,06% Service life = 11 tahun
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Propil Asetat, Multitubular Fixed bed reactor, Perseroan Terbatas |
Subjects: | T Technology > TP Chemical technology > TP155-156 Chemical engineering |
Divisions: | 03-Faculty of Engineering > 24201-Chemical Engineering (S1) |
Depositing User: | Cicillia Fransiska |
Date Deposited: | 19 May 2025 08:04 |
Last Modified: | 19 May 2025 08:04 |
URI: | http://repository.unsri.ac.id/id/eprint/173175 |
Actions (login required)
![]() |
View Item |