ANALISIS BATAS MAKSIMAL DELAY PADA MODEL BOUNDED DELAY MANAGEMENT BUS RAPID TRANSIT (BRT) TRANS MUSI KORIDOR I KOTA PALEMBANG

RAHMA, RANA JANUAR and Octarina, Sisca and Dewi, Novi Rustiana (2019) ANALISIS BATAS MAKSIMAL DELAY PADA MODEL BOUNDED DELAY MANAGEMENT BUS RAPID TRANSIT (BRT) TRANS MUSI KORIDOR I KOTA PALEMBANG. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_44201_08011181520019.pdf] Text
RAMA_44201_08011181520019.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_44201_08011181520019_TURNITIN.pdf] Text
RAMA_44201_08011181520019_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (10MB) | Request a copy
[thumbnail of RAMA_44201_08011181520019_0003098401_0013117004_01_FRONT_REF.pdf] Text
RAMA_44201_08011181520019_0003098401_0013117004_01_FRONT_REF.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_44201_08011181520019_0003098401_0013117004_02.pdf] Text
RAMA_44201_08011181520019_0003098401_0013117004_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (415kB) | Request a copy
[thumbnail of RAMA_44201_08011181520019_0003098401_0013117004_03.pdf] Text
RAMA_44201_08011181520019_0003098401_0013117004_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (366kB) | Request a copy
[thumbnail of RAMA_44201_08011181520019_0003098401_0013117004_04.pdf] Text
RAMA_44201_08011181520019_0003098401_0013117004_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (755kB) | Request a copy
[thumbnail of RAMA_44201_08011181520019_0003098401_0013117004_05.pdf] Text
RAMA_44201_08011181520019_0003098401_0013117004_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (180kB) | Request a copy
[thumbnail of RAMA_44201_08011181520019_0003098401_0013117004_06_REF.pdf] Text
RAMA_44201_08011181520019_0003098401_0013117004_06_REF.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (180kB) | Request a copy

Abstract

BRT Trans Musi does not have a fixed departure schedule. This transportation often due to delay caused by traffic jams on the highway, stopping time at every bus stop if there are passengers going up or down, etc. The delay in the departure of BRT Trans Musi can be set the maximum limit with bounded delay management. This research modeled bounded delay management problems in Corridor I Trans Musi Palembang and analyzed Y constant values on the constraints in the model. This research used the departure schedule of Corridor I Trans Musi Palembang which consists of 35 bus stops, departed from Terminal Alang-Alang Lebar to Ampera and the reverse. Based on the results, the total delay of Corridor I Trans Musi Palembang from Terminal Alang-Alang Lebar to Ampera is 10160 seconds, whereas the total delay from Ampera to Alang-Alang Lebar Terminal is 16042 seconds.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Bounded Delay Management, Delay, Trans Musi
Subjects: Q Science > QA Mathematics
Q Science > QA Mathematics > QA1-939 Mathematics > QA37.3.1.64 Applied Mathematics
Divisions: 08-Faculty of Mathematics and Natural Science > 44201-Mathematics (S1)
Depositing User: Users 576 not found.
Date Deposited: 01 Aug 2019 13:39
Last Modified: 01 Aug 2019 13:39
URI: http://repository.unsri.ac.id/id/eprint/1748

Actions (login required)

View Item View Item