EVALUASI WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM) PADA PROYEK PEMBANGUNAN LATTICE TOWER

AULIA, TASYA PERMATA and Fitriani, Heni (2025) EVALUASI WAKTU DAN BIAYA DENGAN METODE EARNED VALUE MANAGEMENT (EVM) PADA PROYEK PEMBANGUNAN LATTICE TOWER. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_22201_03011282126084_cover.jpg] Image
RAMA_22201_03011282126084_cover.jpg - Cover Image
Available under License Creative Commons Public Domain Dedication.

Download (151kB)
[thumbnail of RAMA_22201_03011282126084.pdf] Text
RAMA_22201_03011282126084.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (66MB) | Request a copy
[thumbnail of RAMA_22201_03011282126084_TURNITIN.pdf] Text
RAMA_22201_03011282126084_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12MB) | Request a copy
[thumbnail of RAMA_22201_03011282126084_0006047901_01_front_ref.pdf] Text
RAMA_22201_03011282126084_0006047901_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (4MB)
[thumbnail of RAMA_22201_03011282126084_0006057901_02.pdf] Text
RAMA_22201_03011282126084_0006057901_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (873kB) | Request a copy
[thumbnail of RAMA_22201_03011282126084_0006057901_03.pdf] Text
RAMA_22201_03011282126084_0006057901_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (411kB) | Request a copy
[thumbnail of RAMA_22201_03011282126084_0006057901_04.pdf] Text
RAMA_22201_03011282126084_0006057901_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (790kB) | Request a copy
[thumbnail of RAMA_22201_03011282126084_0006057901_05.pdf] Text
RAMA_22201_03011282126084_0006057901_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (286kB) | Request a copy
[thumbnail of RAMA_22201_03011282126084_0006057901_06_ref.pdf] Text
RAMA_22201_03011282126084_0006057901_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (263kB) | Request a copy
[thumbnail of RAMA_22201_03011282126084_0006047901_07_lamp.pdf] Text
RAMA_22201_03011282126084_0006047901_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (55MB) | Request a copy

Abstract

This research aims to evaluate project performance in terms of cost and time using the Earned Value Management (EVM) method on a high-complexity construction project: the Phase III development of the Lattice Tower Lightning System, involving the construction of 111 towers at PT Kilang Pertamina Internasional RU III Plaju. EVM is applied to assess project execution efficiency through two key indicators: the Cost Performance Index (CPI) and the Schedule Performance Index (SPI). The data used include primary data from field observations and documentation, and secondary data such as S-curves, bar charts, and progress graphs. The analysis shows an average CPI of 1.1111, indicating that the project was cost-efficient and did not exceed the budget. However, the average SPI of 0.6688 reveals a significant schedule delay, particularly from weeks 2 to 15. Time performance improved in the final stage, with the SPI exceeding 1 in week 16. Delays were primarily caused by design revisions, construction errors, unfavorable site conditions, and extreme weather that disrupted activities. This evaluation is expected to serve as a reference for future projects of similar scale, contributing to improved cost and time efficiency.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Earned Value Management, Lattice Tower, Keterlambatan Proyek, Cost Performed Index, Schedule Performed Index
Subjects: T Technology > TA Engineering (General). Civil engineering (General) > TA190-194 Management of engineering works
Divisions: 03-Faculty of Engineering > 22201-Civil Engineering (S1)
Depositing User: Tasya Permata Aulia
Date Deposited: 21 Jul 2025 03:50
Last Modified: 21 Jul 2025 03:50
URI: http://repository.unsri.ac.id/id/eprint/179274

Actions (login required)

View Item View Item