PRA RANCANGAN PABRIK PEMBUATAN ETANOL HIDROGENASI ASAM ASETAT DAN ETIL ASETAT KAPASITAS PRODUKSI 270.000 TON/TAHUN

ISKANDAR, YUSUF and Yosephine, Yosephine and Moeksin, Rosdiana (2019) PRA RANCANGAN PABRIK PEMBUATAN ETANOL HIDROGENASI ASAM ASETAT DAN ETIL ASETAT KAPASITAS PRODUKSI 270.000 TON/TAHUN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_231035_03031181520021_03031281520081.pdf] Text
RAMA_231035_03031181520021_03031281520081.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7MB) | Request a copy
[thumbnail of RAMA_231035_03031181520021_03031281520081_TURNITIN.pdf] Text
RAMA_231035_03031181520021_03031281520081_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (27MB) | Request a copy
[thumbnail of RAMA_231035_03031181520021_03031281520081_0031085606_01_front ref.pdf] Text
RAMA_231035_03031181520021_03031281520081_0031085606_01_front ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (273kB)
[thumbnail of RAMA_231035_03031181520021_03031281520081_0031085606_02.pdf] Text
RAMA_231035_03031181520021_03031281520081_0031085606_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (138kB) | Request a copy
[thumbnail of RAMA_231035_03031181520021_03031281520081_0031085606_03.pdf] Text
RAMA_231035_03031181520021_03031281520081_0031085606_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (112kB) | Request a copy
[thumbnail of RAMA_231035_03031181520021_03031281520081_0031085606_04.pdf] Text
RAMA_231035_03031181520021_03031281520081_0031085606_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (371kB) | Request a copy
[thumbnail of RAMA_231035_03031181520021_03031281520081_0031085606_05.pdf] Text
RAMA_231035_03031181520021_03031281520081_0031085606_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (224kB) | Request a copy
[thumbnail of RAMA_231035_03031181520021_03031281520081_0031085606_06_ref.pdf] Text
RAMA_231035_03031181520021_03031281520081_0031085606_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (162kB) | Request a copy
[thumbnail of RAMA_231035_03031181520021_03031281520081_0031085606_07_lamp.pdf] Text
RAMA_231035_03031181520021_03031281520081_0031085606_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of Abstrak dalam bentuk microsoft word (Bukan Scan).pdf] Text
Abstrak dalam bentuk microsoft word (Bukan Scan).pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (83kB) | Request a copy

Abstract

The ethanol plant with a production capacity of 270.000 tons/year is planned to be established in 2023 on Jalan Krakatau Steel Industrial Estate, Cilegon City, Banten which is estimated to have an area of 9,2 Ha. This ethanol manufacturing process refers to US Patent 9,272,970 B2, where the process method used is the hydrogenation of acetic acid in the first reactor as well as the hydrogenation of ethyl acetate byproducts obtained from the first reaction to ethanol in the second reactor. The raw materials for making ethanol are acetic acid and hydrogen. The first reactor is a type of fixed bed reactor operating at temperature of 270°C and pressure of 20 atm with a Pt-Sn / Al2O3 catalyst and the second reactor is also a fixed bed reactor operating at 250°C and 40 atm with Cu-Zn/SiO2 catalyst. This plant will be established by adopting Perseroan Terbatas (PT) with the Line and Staff organization system, which is led by a Managing Director with a total of 190 employees. Based on the results of economic analysis, the ethanol plant is feasible to be established because it has fulfilled various economic parameter requirements, which are as follows: • Total Capital Investment (TCI) = US$ 44.371.041,59 • Total Production Cost (TPC) = US$ 328.947.051,56 • Selling Price per year (SP) = US$ 378.000.000,00 • Annual Cash Flow = US$ 37.769.163,93 • Pay Out Time = 1,16 tahun • Rate of Return = 77,3862% • Break Even Point = 36,3277% • Service Life = 11 tahun Keywords: Ethanol, Hydrogenation, Fixed Bed Reactor, Economic Analysis

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Ethanol, Hydrogenation, Fixed Bed Reactor, Economic Analysis
Subjects: T Technology > TS Manufactures > TS1-2301 Manufactures
Divisions: 03-Faculty of Engineering > 24201-Chemical Engineering (S1)
Depositing User: Users 668 not found.
Date Deposited: 02 Aug 2019 08:02
Last Modified: 02 Aug 2019 08:07
URI: http://repository.unsri.ac.id/id/eprint/1833

Actions (login required)

View Item View Item