PUTRI, KADEK PRADNYANITA NADHIRA and AMANDA, RAHFINA ZADIA and Rahmatullah, Rahmatullah (2025) PRA RANCANGAN PABRIK PEMBUATAN VINIL ASETAT MONOMER KAPASITAS 40.000 TON/TAHUN. Undergraduate thesis, Sriwijaya University.
![]() |
Image
RAMA_24201_03031282126045_03031282126079_cover.jpeg - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (133kB) |
![]() |
Text
RAMA_24201_03031282126045_03031282126079.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (9MB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (14MB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (577kB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (514kB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (408kB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (342kB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_06.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (463kB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_07.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (532kB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_08.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (387kB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_09.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (207kB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_10_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (221kB) | Request a copy |
![]() |
Text
RAMA_24201_03031282126045_03031282126079_0017058903_11_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (6MB) | Request a copy |
Abstract
Pabrik pembuatan Vinil Asetat Monomer dengan kapasitas 40.000 ton/tahun berencana didirikan pada tahun 2030 di Kotasari, Purwakarta, Cilegon, Banten dengan luas area pabrik sebesar 3,61 ha. Pabrik beroperasi selama 24 jam/hari dalam 330 hari/tahun. Proses produksi Vinil Asetat Monomer mengacu pada patent No. WO2025028571A1 menggunakan proses oksidasi etilen dengan bahan baku oksigen, asam asetat, dan etilen dalam fasa gas. Reaksi terjadi dalam reaktor multitubular fixed bed reactor dengan temperatur reaksi 160oC dan tekanan 2,25 atm menggunakan katalis Pd-Au/KOAc. Bentuk perusahaan yang dijalankan adalah Perseroan Terbatas (PT) dengan struktur organisasi line and staff. Perusahaan dipimpin oleh direktur utama dengan total karyawan sebanyak 147 orang. Hasil analisa ekonomi menunjukkan pabrik layak didirikan dengan memenuhi persyaratan ekonomi berikut: a)Total Capital Investment (TCI)= US$ 58.830.546,85 /tahun b)Total Production Cost (TPC) = US$ 146.835.447,20 /tahun c)Total Penjualan per Tahun = US$ 221.147.909,25 /tahun d)Pay Out Time on Investment = 1 Tahun e)Rate of Return = 88,42% f)Discounted Cash Flow (DCF) = 95,64% g)Break Even Point (BEP) = 28,45%
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Vinil Asetat, Multitubular Fixed Bed Reactor, Oksidasi Etilen |
Subjects: | T Technology > TP Chemical technology > TP155-156 Chemical engineering > TP155.5P4 Chemical plants--Design and construction |
Divisions: | 03-Faculty of Engineering > 24201-Chemical Engineering (S1) |
Depositing User: | Kadek Pradnyanita Nadhira Putri |
Date Deposited: | 19 Sep 2025 07:40 |
Last Modified: | 19 Sep 2025 07:40 |
URI: | http://repository.unsri.ac.id/id/eprint/184354 |
Actions (login required)
![]() |
View Item |