FARHANA, NADIA and SAFITTRIE, DITA and Nasir, Subriyer (2025) PRA RANCANGAN PABRIK PEMBUATAN VINIL ASETAT KAPASITAS 34.000 TON/TAHUN. Undergraduate thesis, Sriwijaya University.
![]() |
Image
RAMA_24201_03031182126017_03031282126055_Cover.jpg - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (3MB) |
![]() |
Text
RAMA_24201_03031182126017_03031282126055.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (10MB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (22MB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (947kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (592kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (431kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (339kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_06.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (884kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_07.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (349kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_08.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (352kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_09.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (171kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_10_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (190kB) | Request a copy |
![]() |
Text
RAMA_24201_03031182126017_03031282126055_0009096003_11_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (6MB) | Request a copy |
Abstract
Pabrik pembuatan Vinil Asetat dengan kapasitas 34.000 ton/tahun direncanakan akan dibangun di Kawasan Serang, Banten, Jawa Barat pada tahun 2030, dengan perkiraan luas area pabrik sebesar 5,87 Ha. Pembuatan vinil asetat dilakukan dengan mereaksikan bahan baku gas etilen, oksigen dan asam asetat dalam reaktor Fixed Bed dengan katalis Pd/SiO2. Proses pembuatan Vinil Asetat dalam pra-rancangan mengacu pada Paten No. US 2023/0312453 A1. Pabrik ini berbentuk Perseroan Terbatas (PT) dengan sistem organisasi Line and Staff yang dipimpin oleh satu direktur utama dengan jumlah karyawan sebanyak 155 orang. Pabrik Vinil Asetat ini layak dipertimbangkan untuk didirikan karena telah memenuhi parameter kelayakan ekonomi berikut: a) Total Capital Investment = US$ 53.422.662,68 b) Selling Price per Year = US$ 149.940.567,93 c) Total Production Cost = US$ 126.751.651,77 d) Annual Cash Flow = US$ 21.767.003,20 e) Pay Out Time = US$ 2,52 tahun f) Rate of Return on Investment = 32,55% g) Discounted Cash Flow-ROR = 39,82% h) Break Event Point = 36,47% i) Service Life = 11 tahun Kata Kunci: Vinil Asetat, Fixed Bed Reactor, Perseroan Terbatas
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Vinil Asetat, Fixed Bed Reactor, Perseroan Terbatas |
Subjects: | T Technology > TP Chemical technology > TP155-156 Chemical engineering T Technology > TP Chemical technology > TP155-156 Chemical engineering > TP155.5P4 Chemical plants--Design and construction |
Divisions: | 03-Faculty of Engineering > 24201-Chemical Engineering (S1) |
Depositing User: | Nadia Farhana |
Date Deposited: | 22 Sep 2025 01:50 |
Last Modified: | 22 Sep 2025 01:50 |
URI: | http://repository.unsri.ac.id/id/eprint/184396 |
Actions (login required)
![]() |
View Item |