SANDRA, DEDI and Toha, Taufik and Amin, Muhammad (2016) EVALUASI KINERJA DAN BIAYA SEWA ALAT EXCAVATOR BACKHOE KOMATSU PC 400 DAN PC 800 BERDASARKAN HOUR METER PADA KEGIATAN PENGGALIAN BATUBARA DI LOKASI PAL. 1 PT. BUKIT ASAM (PERSERO),TBK. Undergraduate thesis, Sriwijaya University.
Preview |
Text
RAMA_31201_03121002036_8864000016_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) | Preview |
Text
RAMA_31201_03121002036_8864000016_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (382kB) | Request a copy |
|
Text
RAMA_31201_03121002036_8864000016_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (315kB) | Request a copy |
|
Text
RAMA_31201_03121002036_8864000016_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (340kB) | Request a copy |
|
Text
RAMA_31201_03121002036_8864000016_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (129kB) | Request a copy |
|
Text
RAMA_31201_03121002036_8864000016_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (112kB) | Request a copy |
|
Text
RAMA_31201_03121002036_8864000016_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
Abstract
Digging coal activity which take place in PAL 1 on February 2015 – February 2016 period, on pit Curug Pangkul, Murman, Pre-bench, Suban, TAL Ext. T, TAL Ext. B, MT-4, dan TAL South Sump. Based from contract agreement in pacakge 13-025R2 between PT. Bukit Asam (Persero), Tbk with PT. Pama Persada Nusantara, for PAL 1 given 3 units excavator backhoe Komatsu PC 400 Ex252, Ex253, and Ex254) and 2 units excavator backhoe Komatsu PC 800 (Ex2324 and Ex2325) and applying renting equipment system towards excavator backhoe Komatsu unit. Target production of the coal on February 2015 – February 2016 in PAL 1 is 6.814.000 tons evidently only realized 6.304.779 tons. The inaccessibility of target production caused by the delay time of coal excavation. Apart of affecting on production, also affecting renting cost that not match with usage of the hour meter. After doing the optimalization of working hour on refilling the fuel activity, moving location, ripping and cleaning of the coal and sprinkling the equipment, then there optimalization of working hour for PC 400 is 731,25 hours and PC 800 is 564,12 hours. With optimalization of working hour, then obtained productivity optimalization is 991.777,70 tons and renting cost is Rp. 2.678.962.132. Target of coal production is 6.814.000 can be achieved because after the optimalization of productivity becomes 7.295.395,69 tons.
Item Type: | Thesis (Undergraduate) |
---|---|
Uncontrolled Keywords: | Tambang Air Laya, Penambangan Air Laya 1, Hour Meter, Working Hour, Excavator Backhoe |
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Users 2724 not found. |
Date Deposited: | 06 Dec 2019 07:42 |
Last Modified: | 06 Dec 2019 07:42 |
URI: | http://repository.unsri.ac.id/id/eprint/20270 |
Actions (login required)
View Item |