ANALISIS DISTRIBUSI FRAGMENTASI PELEDAKAN TANAH PENUTUP TERHADAP PRODUKTIVITAS ALAT GALI MUAT ELEKTRIFIKASI PC 3000 DI TAMBANG BATUBARA BANKO BARAT PT BUKIT ASAM TBK

PEKIK MERDEKA, MUHAMMAD FAJAR and Toha, Muhammad Taufik and Bochori, Bochori (2019) ANALISIS DISTRIBUSI FRAGMENTASI PELEDAKAN TANAH PENUTUP TERHADAP PRODUKTIVITAS ALAT GALI MUAT ELEKTRIFIKASI PC 3000 DI TAMBANG BATUBARA BANKO BARAT PT BUKIT ASAM TBK. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381320053.pdf] Text
RAMA_31201_03021381320053.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021381320053_TURNITIN.pdf] Text
RAMA_31201_03021381320053_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (23MB) | Request a copy
[thumbnail of RAMA_31201_03021381320053_8864000016_0025107401_01_FRONT_REF.pdf] Text
RAMA_31201_03021381320053_8864000016_0025107401_01_FRONT_REF.pdf
Available under License Creative Commons Public Domain Dedication.

Download (2MB)
[thumbnail of RAMA_31201_03021381320053_8864000016_0025107401_02.pdf] Text
RAMA_31201_03021381320053_8864000016_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (528kB) | Request a copy
[thumbnail of RAMA_31201_03021381320053_8864000016_0025107401_03.pdf] Text
RAMA_31201_03021381320053_8864000016_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (214kB) | Request a copy
[thumbnail of RAMA_31201_03021381320053_8864000016_0025107401_04.pdf] Text
RAMA_31201_03021381320053_8864000016_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (513kB) | Request a copy
[thumbnail of RAMA_31201_03021381320053_8864000016_0025107401_05.pdf] Text
RAMA_31201_03021381320053_8864000016_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (12kB) | Request a copy
[thumbnail of RAMA_31201_03021381320053_8864000016_0025107401_06_REF.pdf] Text
RAMA_31201_03021381320053_8864000016_0025107401_06_REF.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (142kB) | Request a copy
[thumbnail of RAMA_31201_03021381320053_8864000016_0025107401_07_LAMP.pdf] Text
RAMA_31201_03021381320053_8864000016_0025107401_07_LAMP.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy

Abstract

One of the activities in coal mining at PT Bukit Asam Tbk is overburden. Based on information obtained in the field, activities in Pit 3 East Banko Barat are still not efficient, because there is still a large cycle time of the PC 3000 digging tool and there are blasting boulders resulting in the bucket not being fully loaded. The objectives of the study were to determine the type of material, blasting drilling activities, blasting geometry, explosive use, fragmentation distribution of blasting results, and the effect of fragmentation distribution on PC 3000 productivity. Pit 3 blasting targets every month in 2018 amounted to 600,000 BCM and 249,574 BCM realization in November 2018. The blasting geometry applied at Pit 3 is 8.1 meter burden, 9.1 meter spacing, 7.4 meter hole depth, 3.7 meter fill column, 3.7 meter stemming, 26.53 loading density kg / m, and powder factor 0.18 kg / BCM (0.066 kg / ton). The results of the distribution of fragmentation using Split Desktop, obtained an average boulders (fragmentation> 100 cm) of 7.61% or it can be said that the resulting fragmentation is still quite good. The average PC 3000 cycle time is 89.96 seconds, where there is an average waiting time of 59.01 seconds. The actual productivity of PC 3000 before the improvement of work efficiency is 298.51 BCM / hour and productivity after work efficiency improvement is 338.61 BCM / hour.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Blasting, Fragmentation, Productivity, Loading digging tools
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 822 not found.
Date Deposited: 06 Aug 2019 03:02
Last Modified: 06 Aug 2019 03:02
URI: http://repository.unsri.ac.id/id/eprint/2124

Actions (login required)

View Item View Item