ANALISIS PEMILIHAN ALTERNATIF INVESTASI ALAT GALI MUAT DAN ALAT ANGKUT GUNA MEMENUHI TARGET PENINGKATAN PRODUKSI 6 JUTA TON / TAHUN DI PT. BUMI MERAPI ENERGI, KABUPATEN LAHAT, SUMATERA SELATAN

YUDHA, IGNATIUS WILLIAM and Mukiat, Mukiat and HAK, Abuamat (2019) ANALISIS PEMILIHAN ALTERNATIF INVESTASI ALAT GALI MUAT DAN ALAT ANGKUT GUNA MEMENUHI TARGET PENINGKATAN PRODUKSI 6 JUTA TON / TAHUN DI PT. BUMI MERAPI ENERGI, KABUPATEN LAHAT, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021281621052_TURNITIN.pdf] Text
RAMA_31201_03021281621052_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (22MB) | Request a copy
[thumbnail of RAMA_31201_03021281621052.pdf] Text
RAMA_31201_03021281621052.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9MB) | Request a copy
[thumbnail of RAMA_31201_03021281621052_0022115801_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021281621052_0022115801_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021281621052_0022115801_02.pdf] Text
RAMA_31201_03021281621052_0022115801_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (931kB) | Request a copy
[thumbnail of RAMA_31201_03021281621052_0022115801_03.pdf] Text
RAMA_31201_03021281621052_0022115801_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (414kB) | Request a copy
[thumbnail of RAMA_31201_03021281621052_0022115801_04.pdf] Text
RAMA_31201_03021281621052_0022115801_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (484kB) | Request a copy
[thumbnail of RAMA_31201_03021281621052_0022115801_05.pdf] Text
RAMA_31201_03021281621052_0022115801_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (185kB) | Request a copy
[thumbnail of RAMA_31201_03021281621052_0022115801_06_ref.pdf] Text
RAMA_31201_03021281621052_0022115801_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (206kB) | Request a copy
[thumbnail of RAMA_31201_03021281621052_0022115801_07_lamp.pdf] Text
RAMA_31201_03021281621052_0022115801_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy

Abstract

Coal is one of the most used energy resources in the world. Right now, about 22% of our Indonesia energy consumption is being supplied by coal industry. Indonesia in 2030 ,have a plan to increase the use of the coal energy proportion to 30% in order to supply the energy consumption. PT. Bumi Merapi Energi is one of the coal mining industry who have a responsibility to acheive that target. Right now, Pt. Bumi Merapi Energi is operating in 2 different Pit, namely Selatan Pit and Utara Pit is producing up to 2.000.000 tons of coal a year. PT. Bumi Merapi Energi wants to expand its business by increasing the production. In order to achieve that target, digger and hauler are absolutely needed to provide its production capacity. In investing heavy machinery, there are mainly 3 methods of investment namely, buying, leasing, and renting method. Those 3 methods will provide different invesment component such as investment cost, owning cost, and operating cost and will affect the future cashflow projection and thus will resulting in different investment eligibility such as Net Present Value, Internal rate of return, and Payback Period. Buying method will generates a NPV of Rp. 65.502.415.930, IRR of 48,15%, and PbP of 3,37 year . Meanwhile leasing method will generate a NPV of Rp. 66.950.130.389, ROR of 67,58% and PBP of 3,23 year. Renting method will generate a NPV of Rp. 20.442.430.020, ROR of 23,70% and PbP of 4,32 year. It can be concluded that those 3 methods are eligible to be executed while leasing method is the best alternative between those 3 methods in terms of cost opportunity.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Investasi, Alat Berat, Kelayakan dan Analisis Kepekaan
Subjects: L Education > LC Special aspects of education > LC65-67.68 Economic aspects of education
T Technology > T Technology (General) > T1-995 Technology (General)
T Technology > TN Mining engineering. Metallurgy > TN263-271 Mineral deposits. Metallic ore deposits. Prospecting
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 3717 not found.
Date Deposited: 16 Dec 2019 05:05
Last Modified: 16 Dec 2019 05:05
URI: http://repository.unsri.ac.id/id/eprint/21819

Actions (login required)

View Item View Item