EVALUASI CAPAIAN PRODUKSI ALAT GALI MUAT DAN ANGKUT SERTA TOTAL BIAYA PENGGALIAN DAN PENGANGKUTAN BATUBARA KE ROM STOCKPILE DI PT BUMI MERAPI ENERGI KABUPATEN LAHAT PROVINSI SUMATERA SELATAN

NURSIDAH, NURSIDAH and Rahman, A. and Bochori, Bochori (2019) EVALUASI CAPAIAN PRODUKSI ALAT GALI MUAT DAN ANGKUT SERTA TOTAL BIAYA PENGGALIAN DAN PENGANGKUTAN BATUBARA KE ROM STOCKPILE DI PT BUMI MERAPI ENERGI KABUPATEN LAHAT PROVINSI SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181621109.pdf] Text
RAMA_31201_03021181621109.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Request a copy
[thumbnail of RAMA_31201_03021181621109_TURNITIN.pdf] Text
RAMA_31201_03021181621109_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13MB) | Request a copy
[thumbnail of RAMA_31201_03021181621109_00227035604_0025107401_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021181621109_00227035604_0025107401_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (2MB) | Preview
[thumbnail of RAMA_31201_03021181621109_00227035604_0025107401_02.pdf] Text
RAMA_31201_03021181621109_00227035604_0025107401_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (282kB) | Request a copy
[thumbnail of RAMA_31201_03021181621109_00227035604_0025107401_03.pdf] Text
RAMA_31201_03021181621109_00227035604_0025107401_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (520kB) | Request a copy
[thumbnail of RAMA_31201_03021181621109_00227035604_0025107401_04.pdf] Text
RAMA_31201_03021181621109_00227035604_0025107401_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (455kB) | Request a copy
[thumbnail of RAMA_31201_03021181621109_00227035604_0025107401_05.pdf] Text
RAMA_31201_03021181621109_00227035604_0025107401_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (185kB) | Request a copy
[thumbnail of RAMA_31201_03021181621109_00227035604_0025107401_06_ref.pdf] Text
RAMA_31201_03021181621109_00227035604_0025107401_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (7kB) | Request a copy
[thumbnail of RAMA_31201_03021181621109_00227035604_0025107401_07_lamp.pdf] Text
RAMA_31201_03021181621109_00227035604_0025107401_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

Realization coal production at PT Bumi Merapi Energi in Januari-Mei 2019 is not reach 750.000 tons targeted with an achievement of only 332.094 ton. As a result of the non-achievement of production, realization of acceptance PT Tritama Niaga Berjaya was not reached and harm PT Bumi Merapi Energi in terms of meeting consumer demand, so to evaluation the echievement production of excavatorsaandadumpptrucksiand total costs ofwexcavating and transporting coal to ROM Stockpile. The purpose is to find out echievement production of backhoe and dump truck, the factors causing coal production unachievement and total costs required forqexcavatingqandgtransportingncoaltto ROM Stockpile. Data processed with otomatic equation. Production calculation if coal production starts in the first week of Januari-Mei 2019 is 658.896 tons. The factors causing coal production unachievement are cycle time, work efficiency, and schedulling coal excavating and hauling operations. Total costs of excavating and transporting coal are service costs and equipment rental costs. Total costs of excavating and transporting coal to ROM Stockpie based on a production target is Rp 13.687.500.000. Realization of total costs of excavating and transporting coal is Rp 6.060.715.500. Total costs of excavating and transporting coal based on production calculation is Rp 12.024.852.000.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Ketercapaian, Produksi, Effisiensi, Biaya
Subjects: T Technology > TN Mining engineering. Metallurgy > TN799.5-948 Nonmetallic minerals > TN817.S6 Bituminous coal.
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 3730 not found.
Date Deposited: 17 Dec 2019 05:27
Last Modified: 17 Dec 2019 05:27
URI: http://repository.unsri.ac.id/id/eprint/21871

Actions (login required)

View Item View Item