EVALUASI KINERJA PENGEBORAN DAN PELEDAKAN BATUAN ANDESIT SERTA PENGARUHNYA TERHADAP PRODUKTIVITAS ALAT GALI MUAT DI PT SUMBER GUNUNG MAJU, BRAVO 10, PROVINSI BANTEN

MUSLIHIN, AZIZ and Ibrahim, Eddy and Suwardi, Fuad Rusydi (2019) EVALUASI KINERJA PENGEBORAN DAN PELEDAKAN BATUAN ANDESIT SERTA PENGARUHNYA TERHADAP PRODUKTIVITAS ALAT GALI MUAT DI PT SUMBER GUNUNG MAJU, BRAVO 10, PROVINSI BANTEN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021181520006.pdf] Text
RAMA_31201_03021181520006.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (6MB) | Request a copy
[thumbnail of RAMA_31201_03021181520006_TURNITIN.pdf] Text
RAMA_31201_03021181520006_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (14MB) | Request a copy
[thumbnail of RAMA_31201_03021181520006_0022116203_194608161978031001_01_front_ref.pdf] Text
RAMA_31201_03021181520006_0022116203_194608161978031001_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB)
[thumbnail of RAMA_31201_03021181520006_0022116203_194608161978031001_02.pdf] Text
RAMA_31201_03021181520006_0022116203_194608161978031001_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021181520006_0022116203_194608161978031001_03.pdf] Text
RAMA_31201_03021181520006_0022116203_194608161978031001_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (549kB) | Request a copy
[thumbnail of RAMA_31201_03021181520006_0022116203_194608161978031001_04.pdf] Text
RAMA_31201_03021181520006_0022116203_194608161978031001_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (931kB) | Request a copy
[thumbnail of RAMA_31201_03021181520006_0022116203_194608161978031001_05.pdf] Text
RAMA_31201_03021181520006_0022116203_194608161978031001_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (13kB) | Request a copy
[thumbnail of RAMA_31201_03021181520006_0022116203_194608161978031001_06_ref.pdf] Text
RAMA_31201_03021181520006_0022116203_194608161978031001_06_ref.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (382kB) | Request a copy
[thumbnail of RAMA_31201_03021181520006_0022116203_194608161978031001_07_lamp.pdf] Text
RAMA_31201_03021181520006_0022116203_194608161978031001_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy

Abstract

PT. Sumber Gunung Maju, Bravo 10 merupakan perusahaan di bidang penambangann, pengolahan, dan pemasaran batu andesit. Pengeboran menggunakan 5 alat bor dengan target pengeboran sebesar 270.000 BCM. Ukuran fragmentasi boulder (>60cm) batuan hasil peledakan yang diharapkan tidak lebih dari 30%. Hasil penelitian yang didapatkan bahwa ketercapaian produksi pengeboran hanya mencapai 196.174,13 BCM atau sekitar 72,66 %. Hasil distribusi fragmentasi batuan hasil peledakan aktual dihitung menggunakan Split Dekstop diperoleh persentase ukuran boulder sebesar 41,29 %. Cycle time alat gali muat sebesar 27,30 sekon dan produktivitas sebesar 106,06 BCM/jam. Faktor utama yang mempengaruhi kinerja alat bor adalah tingginya waktu hambatan kerja yang menyebabkan efisiensi kerja pengeboran sebesar 56,4 %. Adapun faktor utama yang mempengaruhi ukuran fragmentasi batuan adalah geometri peledakan dengan burden 3 meter dan spasing 3 meter. Setelah dilakukan upaya perbaikan diperoleh efisiensi kerja pengeboran sebesar 78% dengan ketercapaian produksi sebesar 373.687,11 BCM atau 138,4 %. Adapun upaya mengurangi ukuran boulder menggunakan modifikasi geometri peledakan menurut C. J. Konya dengan burden sebesar 2,1 meter dan spasing sebesar 2,44 meter. Perhitungan fragmentasi batuan menggunakan persamaan Kuz-Ram diperoleh fragmentasi boulder sebesar 22,83 % dengan prediksi cycle time sebesar 23,54 sekon dan produktivitas sebesar 120,42 BCM/jam.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: drilling, fracmentation,productivity
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 1032 not found.
Date Deposited: 07 Aug 2019 04:41
Last Modified: 07 Aug 2019 04:41
URI: http://repository.unsri.ac.id/id/eprint/2634

Actions (login required)

View Item View Item