ANALISIS FAKTOR SWABAKAR BATUBARA PADA TEMPORARY STOCKPILE BWE 203 SELATAN DI PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN

WIRATAMA, MUHAMMAD DIO and Handayani, Rr Harminuke Eko and Ningsih, RR. Yunita Bayu (2020) ANALISIS FAKTOR SWABAKAR BATUBARA PADA TEMPORARY STOCKPILE BWE 203 SELATAN DI PT BUKIT ASAM TBK TANJUNG ENIM SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381520081_0009026905_0023037813_01_FRONT_REF.pdf]
Preview
Text
RAMA_31201_03021381520081_0009026905_0023037813_01_FRONT_REF.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021381520081_0009026905_0023037813_02.pdf] Text
RAMA_31201_03021381520081_0009026905_0023037813_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (508kB) | Request a copy
[thumbnail of RAMA_31201_03021381520081_0009026905_0023037813_03.pdf] Text
RAMA_31201_03021381520081_0009026905_0023037813_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (354kB) | Request a copy
[thumbnail of RAMA_31201_03021381520081_0009026905_0023037813_04.pdf] Text
RAMA_31201_03021381520081_0009026905_0023037813_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021381520081_0009026905_0023037813_05.pdf] Text
RAMA_31201_03021381520081_0009026905_0023037813_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (11kB) | Request a copy
[thumbnail of RAMA_31201_03021381520081_0009026905_0023037813_06_REF.pdf] Text
RAMA_31201_03021381520081_0009026905_0023037813_06_REF.pdf - Bibliography
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (393kB) | Request a copy
[thumbnail of RAMA_31201_03021381520081_0009026905_0023037813_07_Lamp.pdf] Text
RAMA_31201_03021381520081_0009026905_0023037813_07_Lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy
[thumbnail of RAMA_31201_03021381520081.pdf] Text
RAMA_31201_03021381520081.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (4MB) | Request a copy
[thumbnail of RAMA_31201_03021381520081_TURNITIN.pdf] Text
RAMA_31201_03021381520081_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (9MB) | Request a copy

Abstract

Meningkatnya permintaan bahan bakar batubara untuk industri menyebabkan produsen terus menerus menaikkan tingkat produksi. Penimbunan terlalu lama dapat menyebabkan terjadinya swabakar batubara yang mengakibatkan kerugian bagi perusahaan. Hasil dari penelitian ini menunjukkan bahwa faktor utama terjadinya swabakar di temporary stockpile BWE 203 Selatan terdapat pada kondisi timbunan dan manajemen first in first out. Kondisi timbunan yang terlalu lama dan tidak dilakukannya pemadatan pada sisi miring stockpile menjadi salah satu penyebab terjadinya swabakar batubara pada stockpile. Manajemen first in first out pada stockpile kurang baik, karena alat yang digunakan untuk menggali stockpile hanya satu yaitu BWE 203. Apabila terdapat masalah pada BWE 203 maka pengangkutan batubara pada temporary stockpile akan berhenti. Dimensi temporary stockpile BWE 203 selatan memiliki bentuk limas terpancung (Chevron) dengan panjang 422,3 meter, lebar alas 80 meter, ketinggian 11,08 meter, dan total tonase batubara sebesar 397.214,7 ton. Kondisi temporary stockpile ini kurang baik dikarenakan lama penimbunan lebih dari 1 bulan dan ketinggian yang melebihi batas yang disarankan jika lama penumpukkan lebih dari 30 hari. Sehingga potensi terjadinya swabakar pada temporary stockpile BWE 203 selatan cukup besar.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: batubara, swabakar, stockpile
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 5914 not found.
Date Deposited: 15 Jun 2020 01:52
Last Modified: 15 Jun 2020 01:52
URI: http://repository.unsri.ac.id/id/eprint/30344

Actions (login required)

View Item View Item