EVALUASI MATCH FACTOR UNIT EXCAVATOR SHOVEL PC 3000 E-6 DAN RT BELAZ 75135 DENGAN FLEET MANAGEMENT SYSTEM PADA PENAMBANGAN ELEKTRIFIKASI DI PIT 2 BANGKO BARAT PT BUKIT ASAM Tbk TANJUNG ENIM, SUMATERA SELATAN

DANI, IHSAN FADILAH and Handayani, Rr Harminuke Eko and Sudarmono, Djuki (2020) EVALUASI MATCH FACTOR UNIT EXCAVATOR SHOVEL PC 3000 E-6 DAN RT BELAZ 75135 DENGAN FLEET MANAGEMENT SYSTEM PADA PENAMBANGAN ELEKTRIFIKASI DI PIT 2 BANGKO BARAT PT BUKIT ASAM Tbk TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.

[thumbnail of RAMA_31201_03021381520064.pdf] Text
RAMA_31201_03021381520064.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (3MB) | Request a copy
[thumbnail of RAMA_31201_03021381520064_TURNITIN.pdf] Text
RAMA_31201_03021381520064_TURNITIN.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (14MB) | Request a copy
[thumbnail of RAMA_31201_03021381520064_0009026905_0024055301_01_front_ref.pdf]
Preview
Text
RAMA_31201_03021381520064_0009026905_0024055301_01_front_ref.pdf - Accepted Version
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Preview
[thumbnail of RAMA_31201_03021381520064_0009026905_0024055301_02.pdf] Text
RAMA_31201_03021381520064_0009026905_0024055301_02.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (370kB) | Request a copy
[thumbnail of RAMA_31201_03021381520064_0009026905_0024055301_03.pdf] Text
RAMA_31201_03021381520064_0009026905_0024055301_03.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (141kB) | Request a copy
[thumbnail of RAMA_31201_03021381520064_0009026905_0024055301_04.pdf] Text
RAMA_31201_03021381520064_0009026905_0024055301_04.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (311kB) | Request a copy
[thumbnail of RAMA_31201_03021381520064_0009026905_0024055301_05.pdf] Text
RAMA_31201_03021381520064_0009026905_0024055301_05.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (34kB) | Request a copy
[thumbnail of RAMA_31201_03021381520064_0009026905_0024055301_06_ref.pdf] Text
RAMA_31201_03021381520064_0009026905_0024055301_06_ref.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (154kB) | Request a copy
[thumbnail of RAMA_31201_03021381520064_0009026905_0024055301_07_lamp.pdf] Text
RAMA_31201_03021381520064_0009026905_0024055301_07_lamp.pdf - Accepted Version
Restricted to Repository staff only
Available under License Creative Commons Public Domain Dedication.

Download (1MB) | Request a copy

Abstract

PT Bukit Asam Tbk adalah salah satu Badan Usaha Milik Negara yang berlokasi di Tanjung Enim, Sumatera Selatan dimana bergerak dalam industri pertambangan batubara. Pada lokasi penambangan di Pit 2 Bangko Barat mempunyai target produksi overburden pada bulan Oktober sebesar 1.200.000 BCM dengan menggunakan alat gali muat Excavator Shovel PC 3000 E-6 berjumlah 3 unit dan alat angkut Belaz 75135 berjumlah 21 unit. Total fleet yang bekerja di Pit 2 Bangko Barat sebanyak 3 fleet. Produksi yang dihasilkan oleh 3 fleet alat gali-muat Excavator Shovel PC 3000 sebesar 1.082.793,70 BCM/bulan dan pada alat angkut Belaz 75135 sebesar 818.492,02 bcm/bulan. Penelitian ini bertujuan untuk meningkatkan produksi pengupasan overburden dengan menurunkan waktu yang hilang. Berdasarkan hasil produksi yang didapat 3 fleet selama bulan Oktober maka target produksi overburden di Pit 2 Bangko Barat tidak tercapai dikarenakan ada 23 kendala yang terjadi dan waktu yang hilang sebesar 767,01 jam/bulan dan setelah dilakukannya evaluasi waktu yang hilang dari kendala, waktu hilang turun menjadi 429,90 jam/bulan dan match factor yang dihasilkan pada fleet 1 sebesar 1,004, fleet 2 sebesar 0,737, fleet 3 sebesar 0,719 dan dilakukan evaluasi match factor pada fleet 2 dan fleet 3 agar sama dengan 1.

Item Type: Thesis (Undergraduate)
Subjects: T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures
Divisions: 03-Faculty of Engineering > 31201-Mining Engineering (S1)
Depositing User: Users 6146 not found.
Date Deposited: 30 Jun 2020 04:10
Last Modified: 30 Jun 2020 04:10
URI: http://repository.unsri.ac.id/id/eprint/30357

Actions (login required)

View Item View Item