WIDODO, SANDY and Yusuf, Maulana and Suwardi, Fuad Rusydi (2020) KAJIAN TEKNIS COAL HANDLING FACILITY-2 SITE PENAMBANGAN MUARA TIGA BESAR UTARA, PT. BUKIT ASAM TBK., TANJUNG ENIM, SUMATERA SELATAN. Undergraduate thesis, Sriwijaya University.
Preview |
Text
RAMA_31201_03021381621095_00250959003_01_front_ref.pdf - Accepted Version Available under License Creative Commons Public Domain Dedication. Download (1MB) | Preview |
Text
RAMA_31201_03021381621095_00250959003_02.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (793kB) | Request a copy |
|
Text
RAMA_31201_03021381621095_00250959003_03.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (539kB) | Request a copy |
|
Text
RAMA_31201_03021381621095_00250959003_04.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
|
Text
RAMA_31201_03021381621095_00250959003_05.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (151kB) | Request a copy |
|
Text
RAMA_31201_03021381621095_00250959003_06_ref.pdf - Bibliography Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (265kB) | Request a copy |
|
Text
RAMA_31201_03021381621095_00250959003_07_lamp.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (1MB) | Request a copy |
|
Text
RAMA_31201_03021381621095.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (2MB) | Request a copy |
|
Text
RAMA_31201_03021381621095_TURNITIN.pdf - Accepted Version Restricted to Repository staff only Available under License Creative Commons Public Domain Dedication. Download (15MB) | Request a copy |
Abstract
In addition to meeting its desired coal production target, PT. Bukit Asam also handles the coal produced. The Muara Tiga Besar site coal handling facility is called the Coal Handling Facility-2 (CHF-2). In the CHF-2 system there are three reclaim feeders as recipients of coal mining results, but only two units of reclaim feeder 1 and 2 are operated. In reclaim feeder 1 there is a bulldozer that works as a coal feeder, while in reclaim feeder 2 the coal feed is carried out by dumptruck. CHF-2 coal production target in September 2019 is 450,000 tons, but the realization is 349,677.60 tons or around 78% of the planned target. The reason for not achieving the production target is due to the low work efficiency caused by the many time constraints that occur. Evaluation was carried out on the obstacles due to material blockage and standby time constraints to reduce the time of the obstacle so that the work efficiency of CHF-2 increased from 62.94% to 73.12%. Another effort to achieve the production target is to operate the reclaim feeder 3 so that CHF-2 production increases to 457,398.42 tons or 101.64% of the planned target.
Item Type: | Thesis (Undergraduate) |
---|---|
Subjects: | T Technology > TN Mining engineering. Metallurgy > TN1-997 Mining engineering. Metallurgy T Technology > TN Mining engineering. Metallurgy > TN275-325 Practical mining operations. Safety measures > TN295.U4 Coal--Drying. Drying apparatus T Technology > TN Mining engineering. Metallurgy > TN331-347 Mine transportation, haulage and hoisting. Mining machinery |
Divisions: | 03-Faculty of Engineering > 31201-Mining Engineering (S1) |
Depositing User: | Users 6401 not found. |
Date Deposited: | 21 Jul 2020 04:20 |
Last Modified: | 21 Jul 2020 04:20 |
URI: | http://repository.unsri.ac.id/id/eprint/31432 |
Actions (login required)
View Item |